BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2026 at 7:00 PM

Updated January 26, 2026

Demolition, site work and new construction of a mixed-use development in Columbus, Ohio. Completed plans call for the demolition of a 43,770-square-foot, one-story above grade municipal facility; and 24,570-square-foot, one-story above grade industrial development.

The scope of the work shall include review of the current Owner developed space program; review of design documents for budget, schedule and constructability; and construction of the facility and construction management services. Scope: The City of Columbus, Department of Finance and Management is receiving proposals until 1:00 PM EST on February 17, 2026 for Construction Manager at Risk (CMaR) Services for the South Outpost project. Project Overview: The City of Columbus seeks a qualified firm to provide comprehensive solution that includes assisting in design-development and construction oversight of a new South Outpost facility which will house an Administration Building (4,350 SF), Vehicle Storage Building (24,570 SF), Brine/Vehicle Wash (3,700 SF), Salt Storage Barn (12,800 SF), Material Storage Structure (5,075 SF), and a Fuel island (1,875 SF). The City's expectation of the CMaR is to bring the construction of the facilities on schedule and on budget. The site is located at 2260 Lockbourne Road, Columbus, Ohio 43207. The site area is approximately 4.69 acres, and the existing buildings will be demolished prior to construction of the new buildings. Note that the total Project will have already been designed and permitted by the time the CMaR is under contract. The scope of the work shall include review of the current Owner developed space program; review of design documents for budget, schedule and constructability; and construction of the facility and construction management services. The selected CMaR will work with the City of Columbus (Owner), and the Architect-of-Record (A/R), who are under separate contract with the City (Owner), to develop construction documents which will lead to several Guaranteed Maximum Price (GMP) amendments provided by the CMaR after completion of design and competitive bidding by the selected CMaR. It is anticipated that completed construction documents will be issued at one time and that the CMaR may pursue one or more bid scopes/ partial GMP amendments with particular consideration of early ordering of long-lead time products and materials. The project will also include a Community Benefits Agreement (CBA) that will be issued by the City. The CMaR will follow the requirements of the CBA. Questions Due Date: Feb 4th 2026, 1:00 PM EST

GC Bidding

Municipal

$10,000,000.00

Public - City

Demolition, New Construction, Site Work

239

7

486

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
165
Bidding Soon
2,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

May 1, 2026

Project location map

2260 Lockbourne Rd, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.