Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2026 at 7:00 PM
Updated January 3, 2026
Renovation of a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a medical facility.
Project Overview Upgrade the chiller plant at the VA Pittsburgh Healthcare System - University Drive campus. Increase cooling capacity to meet current and future HVAC demands. Modernize control systems for improved efficiency and integration. Key Components Chiller Replacement/Addition RFIs: All RFIs must be submitted, in writing, to amy.demarest@va.gov, elijah.mcintosh@va.gov, and Jeffrey.pruett@va.gov by 12/05/2025, 3:00PM EST. No further RFIs will be considered after this date/time. Install new chillers or upgrade existing units to achieve required tonnage. Ensure compliance with VA design standards and ASHRAE guidelines. Controls Upgrade Replace outdated control systems with Direct Digital Controls (DDC). Integrate with the Building Automation System (BAS) for centralized monitoring. Include programming, commissioning, and operator training. Mechanical & Electrical Work Modify piping, pumps, and valves as needed for new chiller configuration. Upgrade electrical panels, feeders, and wiring to support additional load. Energy Efficiency & Sustainability Implement energy-saving measures (e.g., variable speed drives, optimized sequencing). Ensure compliance with VA sustainability requirements. Testing & Commissioning Full functional testing of chillers and control systems. Provide documentation, as-built drawings, and O&M manuals. Additional Requirements Work must be performed in an active medical facility with minimal disruption. Contractor must follow infection control protocols and VA safety standards. Likely SDVOSB set-aside (Service-Disabled Veteran-Owned Small Business). Period of Performance is 540 days from NTP. Magnitude of Construction is more than $10,000,000.
Post-Bid
Medical
$10,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
23
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
March 2, 2026
Multiple Locations, Pittsburgh, PA
Related To This Project
Pittsburgh, PA
Bid Date: Dec 01 2025
Pittsburgh, PA
Bid Date: Jan 23 2026
Pittsburgh, PA
--
Pittsburgh, PA
Bid Date: Dec 08 2025
Pittsburgh, PA
--
Pittsburgh, PA
--
Pittsburgh, PA
Bid Date: Dec 02 2025
Pittsburgh, PA
Bid Date: Jan 07 2026
Pittsburgh, PA
Bid Date: Dec 16 2025
Pittsburgh, PA
Bid Date: Dec 18 2025
Pittsburgh, PA
Bid Date: Nov 13 2025
Pittsburgh, PA
Bid Date: Dec 09 2025
Pittsburgh, PA
Bid Date: Dec 09 2025
Pittsburgh, PA
Bid Date: Nov 24 2025
Pittsburgh, PA
Bid Date: Dec 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
