Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2025 at 7:00 PM
Updated December 3, 2025
Site work and new construction of a stadium in Orchard Park, New York. Completed plans call for the construction of a stadium; and for site work for a stadium.
NYSDOL Certificate of Contractor Registration, NYS Vendor Responsibility Form CCA-2 A/B/C, NYSDOL wage rates, MBE/WBE/SDVOB, Apprenticeship program, and Local and Disadvantaged Workforce requirements may apply to this project. A. GENERAL CONSTRUCTION WORK THE PROJECT CONSIST OF (Not Inclusive of Alternates): A. General Construction Work, including but not limited to: 1. Administration Building Separation 2. Utility Separation Building Drain B. Site Construction Work, including but not limited to: 1. Miscellaneous Paving (Mill and Overlay and Full Depth) 2. Administration Building Water Service 3. Salt Barn Water Service 4. Cut and Cap 16" ACP B. SITE CIVIL WORK The Scope of this contract includes, but is not limited to: 1. Miscellaneous Paving (Mill and Overlay and Full Depth) a. This task will be to address asphalt areas that are determined deficient by the Buffalo Bills and consultant team. Project areas will be determined in Spring 2026 prior to construction, by a representative of the Buffalo Bills. Base bid quantity for Mill and Overlay of 10,000 SF. 2. Admin Building Water Service a. This task will be to provide a new 4" PVC water service from the end of the Commissary water loop and extend to be within 5' from the outside of the Old Administration building. This task includes all associated demolition and restoration. 3. Salt Barn Water Service a. This task will be to provide a new 1" HDPE water service from near the commissary building to a new hose bib at the southeast corner of the Salt Barn. This service is to be installed by horizontal directional drilling to avoid open cutting. This task includes all associated demolition and restoration. 4. Cut and Cap 16" ACP a. This task will be to cut and cap the existing 16" ACP domestic water service for the stadium. The service will be abandoned in place and filled with flowable fill. This task includes all associated demolition and restoration. 5. Team Store Sanitary Connection a. This task will include the installation of new 6" gravity SDR-35 sanitary sewe C. PLUMBING WORK The Scope of this contract includes, but is not limited to: 1. Administration Building Separation a. Disconnect and remove existing fixtures and piping throughout stadium and section of building being demolished. b. Demo. toilet room within 100 level to make space for duct work. c. Demo. Fixtures within Visitor's locker room. 2. Water Service Relocation a. Remove and relocate sections of existing domestic water services to back feed building. 3. Disconnect and remove one of two existing storage tanks a. Remove existing storage tank for electrical gear, and reroute piping to maintain operation. D. MECHANICAL WORK The Scope of this contract includes, but is not limited to: 1. Training Center - Heat Pump Replacement (Drawing M-105) a. Remove heat pumps as shown on drawings and replace with new heat pumps. 2. Training Center - "Second Floor Server Room" Cooling Unit Replacement (Drawings M-106 & M-107) a. Remove existing cooling unit as shown on drawings and replace with new split system with additional capacity. 3. Training Center - Training Room Air Unit Replacement (Drawing M-107) a. Remove existing roof top HVAC air unit and replace with new roof top HVAC air unit. 4. Administration Building (Drawings M-101, M-102, M-103, & M-104) a. Disconnect and remove existing HVAC systems to be demolished with the existing stadium. b. Provide drawings / specifications to maintain existing systems to remain to service the maintained buildings HVAC systems. Coordinate all shut-downs of existing HVAC systems with the Buffalo Bills. Shut-downs to be completed in "OFF" hours or weekends as coordinated with the Buffalo Bills. A. ELECTRICAL WORK The Scope of this contract includes, but is not limited to: 1. Training Center - Electrical work for Heat Pump Replacements: a. Disconnect existing heat pump(s) to be replaced and provide electrical connection to new heat pump(s) as indicated on Drawings. b. Refer to Mechanical Work scope Item "1" for associated Mechanical work. 2. Training Center - Snowmelt System a. Disconnect existing Snowmelt system and remove electrical components including all panels, feeders, contactors, etc. b. Refer to drawings for equipment locations and removals. 3. Training Center - Fiber a. Provide fiber cabling as indicated on drawings to pump house, guard house, and team store. b. Provide fiber from Second Floor MDF to first floor FACP. 5. Team Store Sanitary Connection C. Mechanical Construction Work, including but not limited to: 1. Training Center - Heat pump replacement, ventilation improvements, kitchen make up air replacement and heating coil alterations. 2. Field House - Spilt system replacement 3. Team Store - North end roof top VAV unit replacement 4. Commissary Building - Hot water boiler replacement. D. Plumbing Construction Work, including but not limited to: 1. Stadium - Sewer cleaning and inspection 2. Team Store - Gas piping 3. Operations Building - Domestic water heater replacement E. Electrical Construction Work, including but not limited to: 1. Training Center - Electrical work for Heat Pump Replacements, Electrical work for exhaust fan replacement, and exhaust/supply kitchen dining room air unit replacement 2. Team Store - Roof top unit replacement electrical work 3. Commissary Building- Hot water boiler replacement 4. Field House - Infrared scanning 5. Operations Building - Electrical work for hot water heater replacement 6. Guard House - Electrical work for gate operator replacement 7. Electrical Testing, Inspections and Preventative Maintenance for Abbott Rd. Substation: Requests for interpretation or correction (RFI) shall be submitted to the Architect no later than 4:00 pm on December 2, 2025. The scope of this contract includes, but is not limited to: 1. Administration Building Separation a. Demolition of interior components at the tunnel (040) level. b. Demolition of interior components at the basement (000) level. c. Infill of in-wall openings and fire sealant installation at the basement level. d. Wall demolition at the tunnel level between existing locker room and new stairway e. Installation of new exiting stairway f. Installation of new fire rated corridor wall g. Installation of new and replacement of existing doors h. Fire sealant installation at tunnel corridor wall penetrations i. Installation of new concrete flooring at ramp of tunnel j. Installation of steel lintels at areas indicated on drawings k. Removal and replacement of tunnel bridge The Work will be constructed under five separate Contracts as follows: 1. General Construction Work 2. Site Work 3. Plumbing Work 4. Mechanical Work 5. Electrical Work If any person contemplating submitting a proposal is in doubt as to the true meaning of any part of the Drawings, Specifications or other Contract Documents, or finds discrepancies in or omissions from the Drawings or Specifications, they may submit to the Architect - Engineer a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Question Deadline 12/02/2025 at 4:00 PM ET
Sub-Bidding
Arenas / Stadiums
$400,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 12, 2026
One Bills Drive, Orchard Park, NY
Related To This Project
Orchard Park, NY
Bid Date: May 28 2021
Orchard Park, NY
Bid Date: Dec 12 2025
Orchard Park, NY
Bid Date: Dec 12 2025
Orchard Park, NY
Bid Date: Dec 05 2025
Orchard Park, NY
Bid Date: Dec 11 2025
Orchard Park, NY
Bid Date: Dec 11 2025
Orchard Park, NY
Bid Date: Dec 11 2025
Orchard Park, NY
Bid Date: Oct 29 2025
Orchard Park, NY
--
Orchard Park, NY
--
Orchard Park, NY
Bid Date: Nov 20 2025
Orchard Park, NY
Bid Date: Nov 06 2025
Orchard Park, NY
Bid Date: Nov 06 2025
Orchard Park, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
