BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work for a water / sewer project in Peachtree City, Georgia. Completed plans call for site work for a one-story above grade water / sewer project.

Fayette County, Georgia invites you to submit a bid for lagoon dredging at the Crosstown Water Treatment Plant. Questions concerning this invitation to bid should be addressed to Colette Cobb in writing via email to ccobb@fayettecountyga.gov or fax to (770) 719-5534. Questions will be accepted until 3:00 p.m., Friday, December 5, 2025. CROSSTOWN WATER TREATMENT PLANT 1. Prior to any dredging activities the chosen contractor shall provide Fayette County with all necessary documentation demonstrating environmentally compliant disposal. This documentation shall include a letter stating the ability to accept anticipated character and volume of dredged material and facility permits or licenses. 2. Dredge the south lagoon [see attachment 1]. 3. Dewater the sludge. The Water System will provide on-site locations for any equipment used for this purpose. 4. Transport dewatered sludge to the properly permitted location. 5. Provide daily manifest of the weight of sludge removed and location of where disposed. 6. Conduct erosion control measures as needed for the duration of work. 7. Upon completion of the sludge removal, clean up the area, re-grass and return area to its former condition. 8. The contractor shall take title of the dewatered sludge upon removing it from the Lagoon. Contractor shall provide all labor, material, tools, permits, insurance and necessary equipment to load, transport and deliver sludge from the Crosstown Water Treatment Plant to a properly permitted disposal site. Contractor will pay all fees, costs, and processing expenses for the safe and final disposition of sludge. If a waste characterization profile is required for final disposal, Fayette County Water System will sample and test and make the final report available. Contractor will transport sludge in a method consistent with the safe transfer of sludge, taking care not to spill or leak sludge or otherwise contaminate streets, roadways, ditches, creeks or owners facilities or the disposal site facilities. Denali Water Solutions LLC $248 Synagro South LLC $310 Bio-Nomic Services $481 Merrell Bros., Inc $565

Bid Results

Water / Sewer

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
6
Bidding Soon
1,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

3500 TDK Blvd, Peachtree City, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.