BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Demolition, site work, renovation and addition to an educational facility in Ringgold, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Boynton elementary school phase ii addition and renovation, Ringgold elementary school and Ringgold primary school reroofing and renovation, lakeview middle school renovation, Ringgold high school gym addition and renovation. Questions concerning the REQ CM shall be emailed to Mr. Ray Boaz at rboaz@dhwarchitects.com . PROJECT DESCRIPTIONS The following listed projects are anticipated to be completed under this REQCM. However, CCPS reserves the right to modify or delete projects from this list. Each project listed will be completed under a stand alone CM at Risk Contract based on AIA A133-2019 Standard Form of Agreement Between Owner and Construction Manager where the basis of Payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price. Boynton Elementary School Phase II Addition and Renovation The project consists of classrooms, library and support space addition, renovation of existing cafeteria, gym and ancillary spaces, demolition of existing wings of the school and site development of parking, drives and sidewalks and related support spaces. Project will require multiple phases. Project contains approximately 49,000 new sf and 31,000 renovated sf. Bid Target is 24,750,000. See attached conceptual drawings. Ringgold Elementary School (RES) and Ringgold Primary School (RPS) Reroofing and Renovation Project consists of reroofing both RES and RPS. Project also provides for renovation of RES. Reroofing of RES requires the removal and replacement of the existing structural metal decking. Therefore this work will require phasing the project to allow closing classrooms to allow this work to be accomplished safely, which requires close coordination with CCPs to minimize disturbance to instructional environment. Renovation of RES includes, new ceilings, lighting, mechanical systems, plumbing systems, painting, windows and doors. RES and RPS reroofing

GC Bidding

Educational

$24,750,000.00

Public - County

Addition, Demolition, Renovation, Site Work

81

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
138
Bidding Soon
1,647
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

August 18, 2026

Project location map

3938 Boynton Dr, Ringgold, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.