BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Demolition, site work, renovation and addition to an educational facility in Ringgold, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Boynton elementary school phase ii addition and renovation, ringgold elementary school and ringgold primary school reroofing and renovation, lakeview middle school renovation, ringgold high school gym addition and renovation. The Catoosa County Public School System (CCPS) desires to retain the services of a professional Construction Management (CM) firm for the management, under a construction management/contractor format, for the construction of projects identified below. CM services for each project listed will be performed under a separate construction manager at risk contract. To qualify for consideration, a firm must be prepared to provide the expertise, resources and personnel experience in project planning, cost management, project control, preconstruction and construction techniques, value-engineering analysis, scheduling and quality assurance throughout the planning and construction phases of the project. The services to be performed by the CM will have as their objective the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations established by CCPS and within established quality requirements. The services will be performed during the pre-construction phase and construction phase including working with owner and architect in project planning, arrangement of bid packages, bidding and award of the trade contracts and management of construction until occupancy is achieved. Ringgold High School Gym Addition and Renovation Project consists of addition to main gym to house basketball locker rooms and renovation of existing gym to provide new retractable seating, new lighting, painting as well as removal of existing stage construction allow for additional retractable seating. RHS Gymnasium addition is 2,600 sf. Gymnasium renovation is 19,800 sf. Bid Target is $4,400,000. See attached conceptual plans. RHS Gym o Ground Breaking Spring 2027 o Substantial Completion Summer 2028 Due to the evaluation process, proposals must remain in effect for at least 60 (Sixty) days after date of receipt. Questions concerning the REQ CM shall be emailed to Mr. Ray Boaz at rboaz@dhwarchitects.com .

GC Bidding

Educational

$4,400,000.00

Public - County

Addition, Demolition, Renovation, Site Work

81

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
135
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

August 18, 2026

Project location map

29 Tiger Trail, Ringgold, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.