BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 18, 2025

Demolition, site work, paving and new construction of a civil project in Brownstown Township, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

0.06 mi of bridge reconstruction including culvert replacement, concrete pavement, guardrail, signing and pavement markings on Willow Road east of Sumpter Road, Wayne County. This is a Local Agency project. 0% DBE PARTICIPATION REQUIRED 0% SBP PARTICIPATION REQUIRED Net classification required for this project is 741 Ea or 741 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STL 82000 25A1121 25A1121 Completion Date: 6/1/2027 MIDOT - 2512 032 - Bridge Reconstruction Including Culvert Replacement, Concrete Pavement, Guardrail, Signing and Pavement Markings on Willow Road

Award

Bridges / Tunnels

$796,056.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

26

6

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
185
Bidding Soon
2,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

July 1, 2026

Project location map

Willow Rd, Brownstown Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.