Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Demolition, site work and asbestos abatement for a mixed-use development in Cumming, Georgia. Completed plans call for the demolition of a swimming pool; and hospitality development.
Hearthstone Lodge: 7305 Lanier Drive, Cumming , GA 30041 (parcel ID 274 010) Question Deadline 12/09/2025 at 2:00 PM ET All questions are to be asked via EUNA under Opportunity Q&A No questions are to be asked outside of EUNA The work consists of providing the equipment, supervision, and all other services required for the complete demolition and abatement of the structure and site features identified within the requirements. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The Contractor shall submit applicable Georgia Environmental Protection Division (EPD) Project Notification Forms immediately upon receipt of the Notice of Award. Work shall begin as soon as possible following issuance of the Notice to Proceed (NTP) and commencement of all applicable EPD notification periods - whichever occurs later. All work shall be completed within thirty (30) calendar days following the later of (i) the NTP issuance or (ii) the end of any applicable EPD notification period, unless modified in writing by the County via a change order. The Contractor shall provide all required permits, fees, and any supporting documents required to obtain permits and inspections upon completion of the work as applicable. Asbestos Assessment Report is attached as Exhibit 1 in EUNA Public Files. Requirements: 1. Demolish existing building structures to include slabs. 2. Properly Abate all Asbestos Containing Materials as required by EPD. 3. Demolish pool and backfill, compact with stone and soil. 4. Demolish and remove all associated pool equipment. 5. Demolish and close existing well. 6. Remove all remaining debris in the pool area and anything on the exterior of the facility. All items left behind to be disposed of by the Contractor. 7. Stabilize soil and site as needed and compact and straw. 8. Parking Lot and asphalt to remain. 9. Existing septic system to remain. 10. See additional General Conditions. 11. Contractor is recommended to recycle as much as possible, including the aluminum pool enclosure
Sub-Bidding
Hotel / Motel
$200,000.00
Public - County
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2025
January 19, 2026
7305 Lanier Dr, Cumming, GA
Related To This Project
Cumming, GA
Bid Date: Dec 18 2025
Cumming, GA
Bid Date: Dec 31 2025
Cumming, GA
Bid Date: Nov 12 2025
Cumming, GA
Bid Date: Nov 12 2025
Cumming, GA
Bid Date: Dec 11 2025
Cumming, GA
Bid Date: Dec 18 2025
Cumming, GA
Bid Date: Nov 24 2025
Cumming, GA
Bid Date: Nov 20 2025
Cumming, GA
Bid Date: Dec 11 2025
Cumming, GA
Bid Date: Dec 18 2025
Cumming, GA
Bid Date: Nov 20 2025
Cumming, GA
Bid Date: Nov 17 2025
Cumming, GA
--
Cumming, GA
Bid Date: Nov 20 2025
Cumming, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
