BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a bridge / tunnel in Charleston, South Carolina. Completed plans call for the construction of a 16,500-square-foot, one-story above grade bridge / tunnel; and for site work for a bridge / tunnel.

Ajax has been awarded the Medical University of South Carolina (MUSC) - Campus Connector Bridge. The proposed elevated pedestrian link will extend approximately 900 feet from the Ashley River Tower to the Bioengineering Building, creating a continuous second floor circulation route. The project comprises of selective demolition and roughly 16,500 GSF of new construction, inclusive but not limited to exposed concrete columns, glass fiber reinforced concrete rainscreen & metal panel wall systems, aluminum entrances & curtain wall systems, and interior finishes. Substantial Completion: September 2028 Final Completion: October 2028 Anticipated Bid Packages: Dewatering Metal Panel Systems Special Foundations Precast Arch. Concrete Entrances, Storefronts, Curtain Wall, Windows, Glass, & Glazing Structural & Misc. Steel Sitework & Utilities

Post-Bid

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
78
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

March 1, 2027

Project location map

To Be Determined, Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.