BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Renovation of a medical facility in Napa, California. Completed plans call for the renovation of a one-story above grade, 72-bed medical facility.

The project includes but is not limited to: BHTC - conversion of a 72-bed staff secure re-entry building (currently used only for probation administration) to a Health and Human Services facility that includes a mental health resource center, sobering, detox, and other residential programs. The current project consists of a main building (V-A construction) and four dormitories (V-B construction). 555 Gateway - tenant improvements to the existing 2-story building for use by Probation Child Support Services. While the majority of tenant improvements will be done under a separate contract (including conduit, j-boxes, and frame prep for electric strikes) the scope of this project includes systems furniture and other furniture procurement and installation and associated work. The projects also include security and door access scope. Refer to the Plans and Specifications for more details. Bids are required for the entire work called for by the Plans and Specifications, and neither partial nor contingent bids will be considered. Bids must be valid for 90 days from the date bids are opened. Bidders are responsible for monitoring issued addendums which may be released up to 72 hours prior to bid opening. The project includes but is not limited to: BHTC This is the conversion of a 72-bed staff secure re-entry building (currently used only for probation administration) to a Health and Human Services facility that includes a mental health resource center, sobering, detox, and other residential programs. The current project consists of a main building (V-A construction) and four dormitories (V-B construction). 555 GATEWAY This project completes the tenant improvements to the existing 2-story building for use by Probation Child Support Services. While the majority of tenant improvements will be done under a separate contract (including conduit, j-boxes, and frame prep for electric strikes) the scope of this project includes systems furniture and other furniture procurement and installation and associated work. The projects also includes security and door access scope. Refer to the Plans and Specifications for more details. Engineer Estimate: BHTC engineer's estimate: $2.5 Million 555 Gateway Boulevard engineer's estimate: $1.5 Million Project no - 240768.00, Y2519.00 Question Deadline added as per Addendum 6 12/12/2025 at 5:00 PM PT

Award

Medical

$3,024,000.00

Public - County

Renovation

101

43

32

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
7
Bidding Soon
1,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.