Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published January 2, 2026 at 7:00 PM
Updated May 21, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Townsend, Delaware. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
Pre-bid Meeting: No LOCATION: New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans. The improvements consist of furnishing all labor and materials for this project which involves the removal of existing Bridge 1-447 and construction of a new structure. The new structure will consist of multi-span concrete girders on newly placed wall pier foundations. The proposed bridge will be located slightly south of the existing alignment to avoid overhead utility lines. A full road closure with a posted detour is the preferred alternative for maintenance of traffic at this time. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. Question Deadline 12/08/2025 Questions : E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Performance-based Rating System - 29 Del.C.6962 (c)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. DE DOT - Taylors Bridge Resiliency Project
Bid Results
Bridges / Tunnels
$19,977,555.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
August 3, 2026
Taylors Bridge Rd, Townsend, DE
Related To This Project
Townsend, DE
Bid Date: Jan 13 2026
Townsend, DE
Bid Date: Nov 04 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed