Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 15, 2025 at 7:00 PM
Updated December 17, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Townsend, Delaware. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
Pre-bid Meeting: No LOCATION: New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans. The improvements consist of furnishing all labor and materials for this project which involves the removal of existing Bridge 1-447 and construction of a new structure. The new structure will consist of multi-span concrete girders on newly placed wall pier foundations. The proposed bridge will be located slightly south of the existing alignment to avoid overhead utility lines. A full road closure with a posted detour is the preferred alternative for maintenance of traffic at this time. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. Question Deadline 12/08/2025 Questions : E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Performance-based Rating System - 29 Del.C.6962 (c)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. DE DOT - Taylors Bridge Resiliency Project
Post-Bid
Bridges / Tunnels
$500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
August 3, 2026
Taylors Bridge Rd, Townsend, DE
Related To This Project
Townsend, DE
Bid Date: Jan 28 2025
Townsend, DE
Bid Date: May 28 2024
Operations and Maintenance of the Pine Tree Corners, Milford and Route 5 Transfer Stations - 4585187
Townsend, DE
Bid Date: Feb 22 2022
Townsend, DE
Bid Date: Sep 06 2023
Townsend, DE
Bid Date: Aug 01 2023
Townsend, DE
Bid Date: Jun 13 2023
Townsend, DE
--
Townsend, DE
--
Townsend, DE
Bid Date: Nov 30 2022
Townsend, DE
Bid Date: May 04 2018
Townsend, DE
Bid Date: Jul 31 2018
Townsend, DE
Bid Date: Mar 26 2019
Townsend, DE
Bid Date: Dec 14 2022
Bear, DE
Bid Date: Dec 16 2025
Georgetown, DE
Bid Date: Dec 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
