BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work for a transportation facility in Seattle, Washington. Completed plans call for site work for a transportation facility.

This project will replace 728 power utility meters in the Seattle-Tacoma International Airport (STIA) campus with newer models that can be connected to the ports network. Meters are located in nearly every area and level of STIA, including: each Concourse, Main Terminal, Satellite, Parking Garage, and many Off-site Properties (OSP). Surety, hereinafter called Surety, are held and firmly bound unto the Port of Seattle as Obligee, hereinafter called the Port, in the penal sum of five percent (5%) of the total amount bid for the payment of which Contractor and Surety bind themselves, their executors, administrators, legal representatives, successors and assigns, jointly and severally, firmly by these presents. Equity Goals WMBE Goal 10 Percent. This project will replace 728 power utility meters in the Seattle-Tacoma International Airport (STIA) campus with newer models that can be connected to the port's network. Meters are located in nearly every area and level of STIA, including: each Concourse, Main Terminal, Satellite, Airfield & FAA Tower Parking Garage, and many Off-site Properties (OSP). Time limit for substantial completion of the work is 698 calendar days. This contract has a Project Labor Agreement (PLA). Event bid opening description: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_OWY3MGMxNDctYTgwMS00MGY4LWJmNzQtN2JhMzIwZWY1OWE1%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522a500afd9-6c7d-40ad-8add-b01240951a4a%2522%252c%2522Oid%2522%253a%2522f37f6165-89cf-498a-aecf-7b3a1aed42d8%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=f791f1e6-2bc4-4224-8339-01f9af7d520e&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true. Event pre bid meeting description: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_Y2Q5NzM2ZjQtMjYxNS00NDAwLTlmZDQtYzk5MTg0NTMzNmJm%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522a500afd9-6c7d-40ad-8add-b01240951a4a%2522%252c%2522Oid%2522%253a%2522f37f6165-89cf-498a-aecf-7b3a1aed42d8%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=02d2baf3-9db6-4aff-9ee7-77bb0821f200&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true $12.5M - $15M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 12/04/2025 at 9:00 PM PT online question deadline

GC Bidding

Transportation Terminals

$15,000,000.00

Public - State/Provincial

Site Work

376

28

12

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
99
Bidding Soon
1,720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

February 9, 2026

Project location map

17801 International Blvd, Seattle, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.