BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Renovation of a transportation facility in Baltimore, Maryland. Completed plans call for the renovation of a transportation facility.

Vestibule Door Replacement and Escalator Rehabilitation BWI Airport, Linthicum Heights. Maryland. Amount : 15-20M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. There is no Veteran-Owned Small Business Enterprise (VSBE) subcontract participation goal for this project. Veteran-Owned Participation Goal 0 % Veteran-Owned Small Business Enterprise Firms Contractor Self-Performance Goal 20 % Questions Due November 13, 2025 at 3:00:00 PM Email: kwhite7@bwiairport.com Email: kwhite7@bwiairport.com Replace doors including hardware, operators & signage Replace vestibule ceiling Replace carpet Replace lighting Replace air curtains Replace exit signs Replace power & controls - Doors - Lighting - Air Curtain Units Project Description/Scope of Work Mary Scheuermann/Michael Mezzetti Contract Managers Division of Planning & Engineering, Construction Section Description of Project The work under this Contract is comprised of the following items: A. The project consists of in-kind replacement of all doors in the exterior vestibules on the upper and lower-level roadways of the BWI terminal, hourly garage, daily garage and two doorways at the commuter pier. The terminal scope has 19 entries on the lower level and 20 entries on the upper level of the terminal. This project will rehabilitate the associated vestibulesin the terminal including floors, ceilings, lighting, interior wall finishes, replacement of HVAC systems, replacement of power distribution devices and lighting power in all terminal locations. The doors in the hourly garage will be replaced in kind. No improvements will be made to the vestibule areas. The hourly garage scope includes: 42 sets of sliding glass doors and 15 single automatic swing doors. The existing HVAC units are to remain. The Contractor is to clean ductwork, rebalance the system and commission the units. The doorsin the daily garage will be replaced in kind. No improvements will be made to the vestibule areas. The daily garage has 38 sets ofsliding glass doors, and the commuter pier has 2 sets of sliding glass doors. Specific features include: a. Selective building demolition such as doors and hardware, entry carpet and suspended ceiling systems, HVAC items. b. Doors and hardware. c. Interior finishes including entryway carpet, suspending ceiling, and paint d. Fire suppression system. e. HVAC including hydronics piping, valves and pumps; metal ducts; louvers; exhaust fans; condenser units; split system AC units; indoor air-handling units; unit heaters. f. Electrical including lighting, panelboards, low-voltage transformers, and wiring devices; fuses; enclosed switches and circuit breakers; enclosed controllers; lightning protection; fire alarm. g. Communication

GC Bidding

Transportation Terminals

$20,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

23

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
228
Bidding Soon
3,665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

February 16, 2026

Project location map

Multiple Locations, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.