BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Renovation of an educational facility in Hilo, Hawaii. Completed plans call for the renovation of a educational facility.

Event pre bid conference : No copies of the project scope of work documents will be available at the pre-bid conference. c. Questions, regarding the scope of work or project schedule, may arise at the pre-bid conference, from project site visit(s), or at any time prior to the close of bids. Scope of Work The scope of work includes selective demolition and removal; concrete formwork; concrete reinforcement; cast-in-place concrete; structural steel; metal fabrications; rough carpentry; carpentry; preservative treated lumber; preformed metal roofing; fiber cement siding; elastomeric waterproof deck coating; flashing and sheet metal; sealants; metal doors and frames; flush wood doors; vinyl window; finish hardware; gypsum wallboard; resilient tile floor; painting; markerboards and tackboards; miscellaneous specialties; asbestos abatement; lead paint control measures; handling and disposal of mercury containing lamps; testing and air monitoring; general mechanical requirements; insulation of mechanical systems; air conditioning and ventilation; testing, adjusting and balancing (TAB); basic electrical requirements; electrical demolition; grounding and bonding; hangers & supports for electrical systems; electrical identification; conductors & cables; raceways and boxes; wiring devices; interior lighting, fire alarm system; and miscellaneous related work. Clarifications The deadline to submit requests for clarification of the requirements of this IFB is on December 11, 2025. All clarification requests shall be submitted via HePS QUESTIONS AND ANSWERS section, and all responses shall be issued in an addendum. Substitution Requests Requests for substitutions regarding the IFB and its requirements, must be submitted to the Technical Representative of the Procurement Officer (TRPO), Cory Kaizuka via E-mail at kaizuka@hawaii.edu no later than December 11, 2025 The University intends on issuing a Notice to Proceed on or about April 2026. On-site construction time shall commence on or about AUGUST 18, 2026 and be completed on or before APRIL 16, 2027. All other project requirements shall be completed on or before AUGUST 17, 2027

Award

Educational

$3,033,700.00

Public - State/Provincial

Renovation

59

22

7

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
39
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.