BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Grand Tower, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. Region 5 District 9 Federal Project # NHPPJN27(428) County(s) Jackson Key Route(s) FAP 312 Marked Route(s) IL-3 Questions not accepted as of February 17, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 06, 2026. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 032 - Milling and Resurfacing and All Related Collateral Work Along US Route 150 and IL Route 78 This project involves the removal and replacement of SN 039-0026. Staged construction will be used to maintain traffic for the proposed improvements. The projects improvements include total structure replacement, HMA pavement, shoulders, earthwork, guardrail, etc. This work consists of furnishing all materials, equipment, labor, and other essentials necessary to accomplish the surface preparation and application of thermal spray metallizing to all new structural steel, or portions thereof as detailed in the plans, in the shop. Also included in this work, when specified on the Contract plans, is the application of a paint system over the metallizing in the shop and/or in the field. The purpose of this geotechnical study was to use the provided subsurface information to prepare geotechnical recommendations for the proposed bridge replacement. The project consists of the removal and replacement of an existing 144'-6" three-span bridge on IL 3 over Worthen Bayou. The project site is located approximately 1.2 miles south of IL 149 in Jackson County, Illinois. The existing structure (SN 009-0026) was originally built in 1958 as SBI Route 150, section 130-BY. The new structure (SN 039-0083) will be a two-lane 157'-6" two-span bridge with reinforced concrete decks on 42-inch web girders supported by integral abutments. Staged construction will be utilized during the replacement of the existing bridge. The structure will be designed according to the IDOT Bridge Manual and AASHTO LRFD Bridge Design Specifications. The site location is shown below in Figure 1.1. The TS&L prepared by Quigg Engineering, Inc. (QEI) is attached in Appendix A.

GC Bidding

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

88

9

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
129
Bidding Soon
1,143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

April 28, 2026

Project location map

IL-3, Grand Tower, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.