BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Renovation of a stadium in Chicago, Illinois. Completed plans call for the renovation of a one-story above grade stadium.

The project consists of providing labor and material for the "Waste/Vent Piping FY2026" at 333 W 35th St, Chicago, IL. The work involves replacing various drains, submersibles, water heaters, and other waste/vent piping elements in the stadium. Contractors interested in submitting proposals are required to review the RFP and drawings available through the specified website. There is a mandatory pre-submission conference and walk-through, attendance of which must be confirmed by email. Proposals are to be submitted electronically to the listed email addresses. The Authority reserves the right to reject any or all qualifications or waive any informality at its discretion. Scope of the Work. The Contractor shall furnish all materials, labor, equipment, supplies, tools, scaffolding, transportation, superintendence, coordination, insurance as applicable, taxes, permits, weather protection, bonds and all other services, facilities and items (collectively, the "Work") necessary for the performance of the Project (as described in the relevant Scope of Work in Exhibit I), whether specified herein or not, which are necessary or appropriate, for the full, proper and timely performance and completion of the obligations described in the Contract (including the schedules attached thereto) for such portion, the drawings prepared by the Architect/Engineer and available separately as Exhibit F (the "Drawings"), the specifications prepared by the Architect/Engineer, available separately on the drawings as Exhibit G (the "Specifications"), the Procedures Manual for Contractors attached hereto as Exhibit H, and the Completion Dates and Milestone Schedule attached hereto as Exhibit J (collectively, Exhibits E, F, G, H, and I are the "Contract Documents"). The Work includes all materials, labor and equipment necessary or appropriate for the Contractor to complete the Project or which is reasonably inferable from the Contract Documents. No Bidder shall be entitled to rely upon any oral interpretation of the meaning of this Request for Bids or any other related documents. Bidders shall make requests for interpretations in writing, via email, to Maureen Gorski, Director of Facilities, Illinois Sports Facilities Authority, maureen@isfauthority.com and Chris Frauens, Project Engineer, Elara Engineering, cfrauens@elaraeng.com with a cc: to russell@isfauthority.com, frank@isfauthority.com, and marias@isfauthority.com. Requests for interpretations must be received no later than December 4, 2025. The latest issuance of modifications to this Request for Bids or any of the Contract Documents through bid information letters and addenda is three (3) business days prior to the due date for Bids, or December 8, 2025.

GC Bidding

Arenas / Stadiums

$1,000,000.00

Public - State/Provincial

Renovation

57

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
258
Bidding Soon
3,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

December 22, 2025

Project location map

333 W 35th St, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.