BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work for a water / sewer project in Social Circle, Georgia. Completed plans call for site work for a water / sewer project.

**As of January 20, 2026, This project has been awarded to Amcon Industrial in the Amount of $2,068,535.54..** A bid bond in the amount of 5% of the total amount bid shall be required. In lieu of a bid bond, a cashier's check, cash or an irrevocable letter of credit may be accepted. Both a performance and payment bond will be required in the amount equal to 100% of the contract price. Proof of workers compensation and liability insurance will be required with the City of Social Circle named as additional insured. Questions regarding this request for bids should be emailed directly to Natalie Pifer, Precision Planning, Inc. at 861np@ppi.us Question Deadline 12/11/2025 at 2:00 PM ET The successful contractor must provide proof of workers compensation and liability insurance with the City of Social Circle named as additional insured. The successful bidder shall provide performance and payment bonds at 100% of the total contract value. The City of Social Circle reserves the right to waive any informalities or to reject any or all bids, and to accept any Bid which in its opinion may be in the best interest of the City.

Award

Water / Sewer

$2,068,536.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
181
Bidding Soon
2,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

January 19, 2026

Project location map

Lakewood Dr, Social Circle, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.