BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 6, 2026 at 7:00 PM

Updated January 8, 2026

Site work for a mixed-use development in Portland, Texas. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.

Work Covered by Contract Documents A. Work covers the H.S. Parking Lot Improvements at Gregory-Portland High School located at 4601 Wildcat Dr., Portland, TX 78374. B. Contractors Duties: 1. Except as specifically noted, provide and pay for: a. Labor, materials and equipment. b. Tools, construction equipment and machinery c. Other facilities and services necessary for proper execution and completion of the Work. 2. Since the Owner is a governmental entity or an organization which may be exempted from the sales and use taxes on certain tangible personal property, the Contractor shall be responsible for: a. Determining whether such governmental entity or organization is exempt from such taxes under the Contract Documents. b. Determining whether your purchase of any tangible personal property for use in the performance of this contract is exempt. c. Obtaining any sales tax exemption certificate from the Owner. d. Properly issuing any sales tax exemption certificate to a seller or supplier that the sale of any item of tangible personal property qualifies for an exemption. e. Maintaining any records required by the laws of the State of Texas or by any valid rules and/or regulations of the Comptroller of Public Accounts of the State of Texas. f. Properly submitting any monthly pay requests. g. Payment of any legally assessed penalties or fines for improper use of any exemption Certificate. 3. Securing and paying for, as necessary for execution and completion of the Work, any: a. Permits b. Licenses c. Taxes 4. Complying with all applicable laws, codes ordinances, rules, regulations, orders and/or other requirements of public authorities in connection with performance of the work. 5. Promptly submitting written notice to the Architect of any observed variances in the Contract Documents from known requirements of any public authority. a. It is not the Contractor's responsibility to make certain that Contract Documents comply with codes and regulations. b. Appropriate modifications to the Contract Documents will be made toreflect any changes necessary because of such variances. 6. Assuming responsibility for the Work known to be contrary to such requirements, without notice. 7. Enforcing strict discipline and good order among employees and not employing on the Work: a. Persons not skilled in the task to be performed. 8. Checking Dimensions on Site: a. Verify all measurements before bidding and ordering any materials or doing any work. b. Report any discrepancies to Architect for instructions before proceeding. c. No extras will be allowed for variations from drawings in existing conditions. 9. Approval of Working Surface: a. Notify the Architect of any unsatisfactory condition before performing work over work of other contractors. b. Beginning of work by any Contractor shall constitute his acceptance of previous work or existing conditions. Project No. ACA22-002-00

Award

Sidewalks / Parking Lot

$5,333,000.00

Public - City

Site Work

50

24

49

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

4601 Wildcat Dr, Portland, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.