BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

Two 18-inch Return Activated Sludge (RAS) sludge lines connect clarifiers No. 1 and 2 to the East Plant RAS Wet Well. A 90-degree elbow section of sludge line No. 2 has developed a small leak and needs to be replaced. The District has decided to replace the gate valve and a similar gate valve on the sludge line that connects to clarifier No. 1 as both gate valves have reached the end of their useful lives. The selected contractor will need to bulkhead the 18-inch sludge lines at the RAS Wet Well. The line shall be bulkheaded by installing an inflatable plug or other means and methods determined by the selected contractor. The wall immediately to the north of the sludge line that serves clarifier No. 2 was constructed after the installation of the sludge line and the wall partially encloses the gate valve and the elbow by approximately 2 to 3 inches and 10 to 12 inches respectively. The selected Contractor will need to remove that concrete in order to remove the existing valve and elbow. Based on the above, the selected contractor will do the following work generally: o Bulkhead East Plant RAS Wet Well connections o Furnish, remove, and install 18-inch partially concrete-encased steel RAS piping elbow associated with valve No. 2 o Furnish, remove, and install gate valve No. 1 o Furnish, remove, and install gate valve No. 2 The Milwaukee Metropolitan Sewerage District (MMSD) has a strong commitment to Small, Veteran, Women, and Minority (SWMBE) businesses. To encourage SWMBE participation, MMSD has established procurement goals of 13% for MBE's, 5% for SBE/VBE's, and 2% for WBE's. Firms interested in fulfilling these goals must be certified. MMSD offers its own Small Business certification. MMSD also recognizes SWMBE certifications from other agencies The Owner will host a virtual meeting for live vendor engagement and Q&A at 10:00am on December 4, 2025. All questions related to this proposed Contract, pre-bid presentation, or site tour, must be directed in writing to Millie Neidhardt, Owner's Senior Procurement Specialist, at eneidhardt@mmsd.com no later than three days before the Bid opening date. Questions received after this deadline or directed to other contacts at the Owner will not be recognized.

Post-Bid

Water / Sewer

$50,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

February 26, 2026

Project location map

700 E Jones St, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.