BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

The project consists of the cleaning, Closed Circuit Television Video (CCTV) inspection, and rehabilitation of a force main at the Owner's Jones Island Water Reclamation Facility (JIWRF). The force main carries flow from the head tank at the Inline Pump Station (IPS) to either preliminary treatment or directly to disinfection and consists of approximately 801 linear feet of 72-inch reinforced concrete pressure pipe (RCPP), 177 linear feet of 72/78-inch steel pipe, a 72- inch butterfly valve, and 222 linear feet of 78-inch RCPP for a total length of approximately 1,200 linear feet. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The Contractor will supply all equipment and major power needed for the work. A pre-bid presentation will be posted under Contract J01019C01 on Quest CDN and the District's Procurement Opportunities web page no later than 5:00 p.m. on December 1, 2025. Question Deadline 01/07/2026 All questions related to this proposed Contract, pre-bid presentation, site tour, or interested bidders list must be directed in writing to Millie Neidhardt at eneidhardt@mmsd.com, no later than seven days before the bid opening date. Questions received after this deadline or directed to other contacts at the District will not be recognized. The time for completion of the Contract shall be 365 days Small Business Enterprise, and/or 5% of contract Veteran Business Enterprise, and/or or contract as modified Disabled Veteran Business Enterprise Involvement Goal amount. Women Business Enterprise 2% of contract Involvement Goal amount. or contract as modified Minority Business Enterprise 13% of contract Involvement Goal amount. or contract as modified

GC Bidding

Water / Sewer

$2,000,000.00

Public - County

Site Work

32

12

2

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
136
Bidding Soon
2,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 16, 2026

Project location map

700 E Jones St, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.