BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of an educational facility in Longueuil, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20106961 Deadline for receipt of complaints 2025-12-03 Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 6 Value of the Tender guarantee (amount or percentage) : (15%) This project FICV-1825 - Interior redevelopment and ventilation addition (Phase 3) at the Terry Fox school, located in Saint-Hubert, includes: Generally, the redevelopment (lighting, flooring, paint) of four (4) classes of the floor including the demolition of corridor sections, openings in the walls for the passage of ventilation ducts, the addition of a new roof ventilation unit, civil works for electrical support as well as soil decontamination. In Architecture: Interior redevelopment work of four (4) classes (vinyl floor covering, wall painting, ceilings, hardware, furniture and other related miscellaneous works among others) Premises concerned: Classes 203 to 206. Additional area: The corridor adjacent to these classes. Premises already renovated: Classes 211 to 214 have already benefited from the repair of interior finishes during a previous project phase. Electromechanical work: New system: A ventilation system with energy recovery (100% fresh air) will be installed on the roof. Scope of ventilation: This new system will serve the redeveloped premises (classes 203 to 206) and the other premises on the floor. Addition of ducts: Ventilation ducts will be added in classes 211 to 214. Existing ducts: Classes 207 to 210 already have ventilation ducts. Classes 203 to 206 (redeveloped areas): Replacement of heating cabinets. Replacement of the lighting. Relocation and addition of services such as electrical outlets and/or telecommunications outlets. Electrical input: The electrical input will be redone in order to power the new ventilation equipment. In Structure: Work on the support structure for the new mechanical equipment on the roof as well as site monitoring related to the installation of this structure. In Civil: Electrical support work and surface repair and soil decontamination during works related to the electrical support (A laboratory will be present during the construction site) In industrial hygiene: Asbestos abatement (low, moderate and high risk And other related miscellaneous work. IMPORTANT - Closure of the School Board Please note that the Riverside School Board will be closed from July 19 to August 3, 2025 (construction holidays). No return of emails or telephone messages will be made during this period.

GC Bidding

Educational

$500,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
234
Bidding Soon
2,888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

June 26, 2026

Project location map

1648 Rue Langevin, Longueuil, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.