BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 17, 2025

Remodeling of an educational facility in Farmington Hills, Michigan. Completed plans call for the remodel of a educational facility.

Sealed Bids for the Plymouth-Canton Community Schools, 2020 Bond, PCCS MS-3, consisting of: PCCS MS-3: Discovery Middle School Remodel This Bid Package will consist of separate sealed Bids for the following Bid Divisions: 101: Earthwork/ Site Utilities 102: Asphalt Paving & Exterior Concrete 103: Selective Demolition 105: Interior Concrete Flat Work 108: Carpentry / General Trades 109: Roofing / Sheetmetal 114: Aluminum Entrances / Storefront / Glass & Glazing 117: Acoustical Treatments 118: Carpet / Resilient Tile Flooring 120: Painting 125: Toilet Partitions 128: Educational Casework 140: Plumbing 142: HVAC 143: Electrical Bids shall be submitted electronically into Building Connected. Bid security by a quality surety in the form of a Bid bond, cashier check, or certified check in the amount of five percent (5%) of the Bid shall be submitted with each Bid, payable to Plymouth-Canton Community Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or the failure of the Bidder to enter into a Contract for performance. All cashier's checks must be scanned and submitted electronically through Building Connected by the Due Date and be delivered to the School District Administration Office located at 454 S Harvey St, Plymouth, MI 48170 to the attention of Jill Minnick, within 48 hours of the Due Date. The School District will not consider a Bid that does not include a Bid security. Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a Contract, the successful Bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the Contract price. Plymouth-Canton Community Schools reserves the right to accept or reject any and all Bids, either in whole or in part, to waive any informalities and irregularities therein, or to award the Contract to other than the Bidder (s) submitting the best financial Bid (low Bidder), in its sole and absolute discretion.

Post-Bid

Educational

$20,000,000.00

Public - County

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
179
Bidding Soon
2,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

January 15, 2026

Project location map

Multiple Locations, Farmington Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.