BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Demolition, site work and new construction of a water / sewer project in Louisville, Kentucky. Completed plans call for site work for a water / sewer project; for the construction of a water / sewer project; and water / sewer project.

Gunpowder Lane Pump Station Elimination and Carslaw Court Pump Station Elimination Contract No. 17346, Budget ID No. H09242, Drawing Record No. 17346/ Sheet No. 1-21 and Drawing Record No. 17085/ Sheet No. 1-8 Description and location of Project: This project provides for the construction of a new pump station and decomissioning of 3 pump stations, installation of approximately 125 linear feet of 6-inch force main; 250 linear feet of 8-inch gravity sewer; 1,115 linear feet of 12-inch gravity sewer, 315 linear feet of 48-inch gravity sewer; 560 linear feet of 30-inch Jack and Bore; 11 manholes; and appurtenant work. All work shall be done in accordance with MSD's Standard Specifications. The Engineer's Construction Cost Estimate for this project is between $ 7,000,000.00 and $ 8,500,000.00 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 18.0% MBE - African American participation 2.0% MBE - Asian-Indian American participation 15.0% WBE - Caucasian Female participation The aspirational participation goals are 15.0% MBE and 6.0% WBE a. Bid Bond in the amount of 7.5% of the Total Bid, and a b. Performance Bond in the penal sum not less than one hundred percent (100%) of the Contract Price, and a c. Payment Bond in the penal sum not less than one hundred percent (100%) of the Contract Price, and a d. Maintenance Bond in the penal sum as described on Contractor's Insurance and Bonding attachment of the Information to Bidders A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals and all other items necessary to complete the project in accordance with the requirements of the Contract Documents. B. The principal following: This Contract provides for the installation of approximately 1925 linear feet of 12-inch sanitary sewer; 40 linear feet of 8-inch sanitary sewer; 400 linear feet of 48-inch sanitary sewer; 470 linear feet of 30-inch casing bore & jack with 12-inch carrier pipe under U.S. Highway 42 and entryway to Prospect Pointe; 10 sanitary manholes; 100 linear feet of 6- inch force main; tie-in to existing manhole on Beech Avenue; tie-in to existing manhole on Gunpowder Lane; pavement restoration; erosion prevention and sediment control; installation of new Beech Avenue Pump Station on Beech Avenue; decommissioning of two pump stations (Prospect Pointe, Gunpowder); and appurtenant work. Final Completion within 515 days of the Notice to Proceed

Bid Results

Water / Sewer

$4,780,000.00

Public - County

Demolition, New Construction, Site Work

60

23

8

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
98
Bidding Soon
1,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 18, 2026

Project location map

Multiple Locations, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.