Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 30, 2026 at 8:00 PM
Updated March 31, 2026
New construction and renovation of a mixed-use development in Big Lake, Texas. Completed plans call for the construction of a 21,672-square-foot, one-story above grade elderly care / assisted living facility; 42,755-square-foot, one-story above grade medical facility; one-story above grade clubhouse / community center; and one-story above grade fitness / recreation center.
The construction will commenced early in April 2026, but the completion date is not yet determined.** Scope of Project: Construction of a new Wellness Center, renovation to hospital, new Assisted Living Facility and Independent Cottages, and renovation to Community Center. For Construction of: Projects include: RHD-Wellness Center 35,280 square feet 2-story commercial construction RHD–Community Center 3,450 square feet Single story commercial renovation and addition RHD-Outpatient PT Renovation & Addition 4,025 square feet Single story medical renovation and addition RHD-Assisted Living 21,672 square feet Wood framed assisted living facility 8 additional 1 and 2 bedroom standalone cottages Key Objectives: Deliver a modern, energy-efficient facility ready for tenant occupancy. Minimize disruptions to surrounding urban traffic and businesses. Incorporate innovative construction methods to optimize efficiency and safety1) New Wellness Center. 2) Improvements, renovation, and expansion of the Out-Patient PT Department at the hospital. 3) Construction of new Assisted Living and Independent Living Facility 4) Improvements, renovation, site improvements to existing Community Center A. The Work includes, but is not limited to, cast-in-place concrete, dimension stone, fluid applied waterproofing, water repellents, structural steel, steel deck, cold formed metal framing, metal fabrications, rough carpentry, insulation, firestopping, smokestopping, metal roof panels, single-ply membrane roofing, roof specialties, roof accessories, flashing and sheet metal, joint sealers, steel doors and frames, glazing, exterior sheathing, Portland cement plaster, mechanical, plumbing and electrical work, all as indicated in the Contract Documents. B. Project Budget for Construction is estimated at $ 22,360,000.00. This timeline accounts for phased construction to allow for sequential occupancy of lower floors during build-out. Phase 1: Site Preparation and Foundation (Months 1-4): Mobilization, excavation, and foundation pouring. For Wellness Center, Assisted Living, Community Center Phase 2: Superstructure and Envelope (Months 4-9): Framing, roofing, and exterior cladding. For Wellness Center, Assisted Living, Community Center Phase 3: Interior and MEP Installation (Months 9-18): Fit-outs, electrical, plumbing, and HVAC systems. For Wellness Center, Assisted Living, Community Center Phase 4: PT Addition and Refresh (Months 12-18): Work to commence after relocation of Wellness functions in the hospital to the new Wellness Center.
Post-Bid
Fitness / Rec Centers
$22,360,000.00
Public - County
New Construction, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2026
April 15, 2026
1300 N Main Ave, Big Lake, TX
Related To This Project
Big Lake, TX
Bid Date: Jan 23 2026
Big Lake, TX
Bid Date: Mar 24 2026
Big Lake, TX
Bid Date: Nov 18 2025
Big Lake, TX
Bid Date: Oct 10 2025
Big Lake, TX
Bid Date: Jul 11 2025
Big Lake, TX
Bid Date: Jul 01 2025
Big Lake, TX
Bid Date: Jun 06 2025
Big Lake, TX
Bid Date: Mar 28 2025
Big Lake, TX
Bid Date: Mar 21 2025
Big Lake, TX
Bid Date: Feb 26 2025
Big Lake, TX
--
Big Lake, TX
Bid Date: Dec 06 2024
Big Lake, TX
Bid Date: Mar 04 2025
Big Lake, TX
Bid Date: Sep 20 2024
Big Lake, TX
Bid Date: Sep 20 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
