Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Renovation of a medical facility in Sacramento, California. Completed plans call for the renovation of a one-story above grade medical facility.
Project is seismic compliance to achieve Structural Performance Category (SPC) 4D. Both East Wing Tower and Radiology buildings are currently rated SPC 2, which is defined as a building that may not be repairable or functional following a seismic event. A classification of SPC 4D is required to remain as an acute care building beyond January 2030. Project consists of structural retrofit, which could include strategic strengthening of wall cladding panels, existing shear walls, floor slabs, and structural framing. Bidding documents are available only to prequalified bidders, and bids must be accompanied by bid security of 10% of the Lump Sum Base Proposal. The successful bidder must carry insurance policies approved by the University, issued by companies rated Best as A- or better with a financial classification of VIII or better, or have an equivalent rating by Standard and Poor's or Moody's. The successful bidder and its subcontractors must follow the nondiscrimination requirements and pay prevailing wages at the location of the work. The awarded contractor shall make best efforts to provide qualified SBEs and DVBEs with maximum opportunity to participate. All contractors or subcontractors, regardless of tier, must be registered with the Department of Industrial Relations and the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pre-qualification requirements: Only prequalified bidders as listed (Roebbelen Contracting and Swinerton Builders) may submit proposals. Prequalified bidders must attend a mandatory virtual pre-bid conference and an in-person job walk in their entirety. The successful bidder must possess a California "B" - General Building contractor's license at the time of bid opening. Estimated Construction Cost: $850.000.00.
Bid Results
Medical
$841,674.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 12, 2026
4800 2nd Ave, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Dec 09 2025
Sacramento, CA
Bid Date: Dec 15 2025
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: Dec 17 2025
Sacramento, CA
Bid Date: Jan 14 2026
Sacramento, CA
Bid Date: Dec 17 2025
Sacramento, CA
Bid Date: Dec 11 2025
Sacramento, CA
Bid Date: Dec 17 2025
Sacramento, CA
Bid Date: Jan 13 2026
Sacramento, CA
Bid Date: Dec 17 2025
Sacramento, CA
Bid Date: Dec 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
