Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2026 at 7:00 PM

Updated February 16, 2026

Site work for a mixed-use development in Orlando, Florida. Completed plans call for site work for a power facility.

The Scope of Work for the Epcot Generator Decommissioning includes, but is not limited to: 1. Disconnect and Removal of two 12.5KV Generators and associated enclosures, and empty fuel tanks. 2. Demolition of 15KV Generator Switchgear. 3. Demolition of all interconnecting power and controls conductors. 4. Closeout and abandonment of underground overflow tank and associated piping. Question Deadline 01/22/2026 at 6:00 PM ET Online Q&A : Yes Liquidated Damages : $904 per day past substantial completion Project Duration : 5 days from NTP Bid date changed from 12/19/2025 to 1/9/2026 as per mail.

GC Bidding

Power Plant

$150,000.00

Public - County

Site Work

47

20

11

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
184
Bidding Soon
2,892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

751 Backstage Ln, Orlando, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed