BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Renovation of a library in Ventura, California. Completed plans call for the renovation of a library.

PROJECT NO. 3012371 Specification No. CP24-01 Project work consists of rehabilitation of the existing E.P. Foster Library south building, including installation of a new HVAC system, new electrical transformer and main switchboard upgrades, elevator modernization, reconfiguration of the first-floor public restroom, upgrades to the first-floor library area, renovation of the second-floor restrooms and staff lounge, replacement of windows and storefront systems, flooring and lighting replacement, re-roofing, and interior and exterior painting. A. The work Includes following: o Removing all the library collection, tech equipment, furniture for construction and securely storing them temporarily for the duration of construction and placing them back after construction o HVAC Replacement o New Electrical Service SCE Transformer and Main Switchboard o Elevator Modernization (Cab and Hydraulic System Replacement) o 1 st Floor Friends of Library Space Reconfiguration o 1 st Floor Restroom Reconfiguration to Multi-User o 1 st Floor Copier Reconfiguration to (3) Study Rooms o New All-Gender Restroom Next to Topping Room o 2nd Floor Restroom Upgrade (Finishes & Fixtures) o 2nd Floor Staff Lounge Upgrade o Window/Storefront Replacement (All Exterior) o Flooring Replacement (1st & 2nd Floor) o Interior And Exterior Wall Repaint & Caulking (1st & 2nd Floor) o Re-Roof Building (Not Incl. North Building) o Solar PV/Battery o Fire Alarm Replacement o Water Service Replacement o Lighting Replacement to Led

Post-Bid

Library

$9,200,000.00

Public - County

Renovation

115

48

30

7

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
138
Bidding Soon
1,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 16, 2026

Project location map

651 E Main St, Ventura, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.