Published January 23, 2026 at 7:00 PM
Updated January 24, 2026
Site work for a water / sewer project in Summerland Key, Florida. Completed plans call for site work for a water / sewer project.
SCOPE OF WORK The work to be done consists of the furnishing of all labor, materials, equipment, performance, etc., of all work included in this Contract. Working includes constructing a complete and properly functioning system, materials testing, maintenance of vehicular access throughout construction, project restoration, operation and maintenance manual preparation, and record drawing preparation. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these Specifications and as shown on the Drawings. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean-up, replacements, and restoration required as a result of damages caused during this construction. The Contractor shall supply the necessary items which includes proper construction warning signs, Variable Message Boards (VMBs), lighting devices, markings, fencing, and barricades for the project area. The Contractor shall be responsible for installation and maintenance of all devices and requirements for the duration of the construction period This project consists of converting the existing potable water ground storage tank into a wastewater equalization tank, and replacement of associated piping and appurtenances as needed. The work of this Contract consists of furnishing all material, labor, equipment, etc., necessary for the general construction of the following, as shown on the Drawings and as specified herein Demolition of existing piping, valves, pumps, electrical equipment, 45 instrumentation, and various elements of the existing water storage tank; Installation of the Off-site Force Main; Coating of the interior of the existing 200,000-gal water storage tank; Equalization Tank Return Pump Station, us associated Piping and Valves; Tank Spray System, plus associated Piping and Valves; Yard Piping, Valves and Appurtenances; Instrumentation and SCADA Improvements; Standby Diesel Generator and Electrical Improvements; Site Restoration.
Post-Bid
Water / Sewer
$3,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2026
March 20, 2026
120 Center Rd, Summerland Key, FL
Related To This Project
Summerland Key, FL
--
Summerland Key, FL
Bid Date: Mar 20 2025
Summerland Key, FL
Bid Date: Nov 01 2023
Medley, FL
Bid Date: Jan 07 2026
Lake City, FL
Bid Date: Jan 12 2026
Tallahassee, FL
Bid Date: Feb 12 2026
Daytona Beach, FL
--
Fort Lauderdale, FL
--
Seminole, FL
--
Homestead, FL
--
Fort Lauderdale, FL
--
Miami, FL
Bid Date: Dec 08 2025
Orlando, FL
Bid Date: Feb 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.