Site work for a water / sewer project in Summerland Key, Florida. Completed plans call for site work for a water / sewer project.

SCOPE OF WORK The work to be done consists of the furnishing of all labor, materials, equipment, performance, etc., of all work included in this Contract. Working includes constructing a complete and properly functioning system, materials testing, maintenance of vehicular access throughout construction, project restoration, operation and maintenance manual preparation, and record drawing preparation. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these Specifications and as shown on the Drawings. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean-up, replacements, and restoration required as a result of damages caused during this construction. The Contractor shall supply the necessary items which includes proper construction warning signs, Variable Message Boards (VMBs), lighting devices, markings, fencing, and barricades for the project area. The Contractor shall be responsible for installation and maintenance of all devices and requirements for the duration of the construction period This project consists of converting the existing potable water ground storage tank into a wastewater equalization tank, and replacement of associated piping and appurtenances as needed. The work of this Contract consists of furnishing all material, labor, equipment, etc., necessary for the general construction of the following, as shown on the Drawings and as specified herein Demolition of existing piping, valves, pumps, electrical equipment, 45 instrumentation, and various elements of the existing water storage tank; Installation of the Off-site Force Main; Coating of the interior of the existing 200,000-gal water storage tank; Equalization Tank Return Pump Station, us associated Piping and Valves; Tank Spray System, plus associated Piping and Valves; Yard Piping, Valves and Appurtenances; Instrumentation and SCADA Improvements; Standby Diesel Generator and Electrical Improvements; Site Restoration.

Post-Bid

Water / Sewer

$3,000,000.00

Public - State/Provincial

Site Work

49

20

28

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

March 20, 2026

Project location map

120 Center Rd, Summerland Key, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.