Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 1, 2025 at 7:00 PM
Updated December 2, 2025
This is a service / maintenance or supply contract in Laguna Beach, California. Contact the soliciting agency for additional information.
The selected firm shall perform materials testing and special inspection services during construction of the Promenade on Forest. Travel time and mileage to and from the City should not be included or charged as part of the services. Billable work hours or durations will be based on on-site hours and no more than a 2-hour minimum shall be allowed for durations less than 2 hours. Office and laboratory service hours shall be based on the actual hours. The Contractor's schedule shall determine the timing of services required. Services shall include: 1. Attend construction progress meetings, if requested. 2. Compaction testing of pavement subgrade, pipeline bedding and backfill. 3. Laboratory maximum dry density and optimum moisture content test of the soil and aggregates. 4. Inspection and sampling of concrete placement, including compressive strength testing of concrete cylinders. One cylinder shall be broken at 7 days, one at 14 days, and two at 28 days. A fifth cylinder shall be collected but will not be broken unless necessary due to low strength results. Provide compressive strength testing reports within two business days of testing. Expected for concrete crash barrier. 5. Rebar inspection and steel tensile testing, as needed. Expected for concrete crash barrier. 6. Preparation of daily field reports to include results of the field compaction testing and laboratory testing to confirm if bedding, backfill subgrades and pavements are installed in accordance to the plans and specifications. 7. Submit daily reports to the City project manager by e-mail no later than the close of the next business day. 8. Final report documenting the results of construction observation and testing. Response Types Cost File Type of Award Lump Sum The method of Contractor Selection has not been Determined at this time.
Conceptual
Conservation and Development
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2026
Multiple Locations, Laguna Beach, CA
Related To This Project
Laguna Beach, CA
Bid Date: Dec 23 2025
Laguna Beach, CA
Bid Date: Dec 30 2025
Laguna Beach, CA
--
Laguna Beach, CA
--
Laguna Beach, CA
--
Laguna Beach, CA
Bid Date: Mar 31 2026
Laguna Beach, CA
Bid Date: Mar 12 2026
Laguna Beach, CA
Bid Date: Dec 17 2025
Laguna Beach, CA
Bid Date: Oct 30 2025
Laguna Beach, CA
Bid Date: Oct 28 2025
Laguna Beach, CA
--
Laguna Beach, CA
--
Laguna Beach, CA
--
Laguna Beach, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
