BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated March 17, 2026

Renovation of a water / sewer project in Lemoore, California. Completed plans call for the renovation of a water / sewer project.

Completion of TTHM Treatment Stations 7 And 11 The completion of the City of Lemoore's TTHM Treatment Stations 7 and 11 project includes a comprehensive assessment of both facilities and the execution of all work items specified in the Bid Package and identified through the assessment. This includes completing the work indicated on the punch lists and facility plans provided. The project also involves operating and testing the various systems and processes within each facility, performing wet testing and startup, and conducting full commissioning of each plant to verify that all systems function as intended. Question Deadline 01/13/2026 at 12:00 PM PT All requests for information (RFI) must be submitted in writing to Stephanie Bell at BidRFI@qkinc.com This Project is being funded by Local Funds The project, if awarded, will be based upon all the work contemplated in the Base Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Location: Water Treatment Station 7, located to the north of Lemoore College, off of Bush Street; and Water Treatment Station 11 located on the northeast comer of 18th Avenue and Glendale Avenue, City ofLemoore. Project Description: This project encompasses the full execution and completion of all work items specified in the facility plans and detailed in the itemized punchlists for the City of Visalia's Well Station 7 and Well Station 11 Water Treatment Plants. Scope of work includes performing all necessary labor; furnishing and installing all requiredmaterials, tags, instruments, and equipment; and carrying out all associated tasks to ensure each item is fully completed to specification. Additionally, the project includes the startup, operation, and testing of all systems and processes within each facility, culminating in the successful commissioning ofboth plants. The Contractor shall maintain close coordination with the City and its facility operations partner, Specialized Utility Services Program (SUSP), throughout the duration ofthe project. Completion of construction, startup and commissioning of Water Treatment Station 7 and Water Treatment Station 11. This includes, but is not limited to, addressing all punchlist items identified for each Station and ensuring that all treatment systems, facility areas, equipment, appurtenances, instrumentation, and controls are fully installed, operational, and compliant with the project plans, specifications, and the Operation and Maintenance (O&M) manuals. PLC programming for each facility will be performed by Telstar, under separate contract with the City. Completion-seventy-five (75) Working Days

Post-Bid

Water / Sewer

$755,000.00

Public - City

Renovation

261

12

4

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
2
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

February 19, 2026

Project location map

Multiple Locations, Lemoore, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.