BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Site work for a development in Port Lavaca, Texas. Completed plans call for site work for a development.

The Work to be performed under these Drawings and Specifications consists of furnishing all labor, materials, and equipment for performing all Work required for conducting surveys; protection of the environment, excavation, construction of approximately 2,100 linear feet of rock breakwater and 920 linear feet of reef breakwater, mechanical excavation two upland borrow sources, installing approximately 9,810 cubic yards of fill material for marsh creation, and planting approximately 2.0 acres of low marsh species. Question Deadline 01/09/2026 at 5:00 PM CT QA Expiration Date has changed from 12/29/2025 5:00:00 PM CST to 1/9/2026 5:00:00 PM CST Rock Breakwater: o Work includes minor earthwork as required to meet foundation elevations and construction of approximately 2,100 linear feet of Rock breakwater to +4' elevation. o Additive 1: Work includes building the Rock Breakwater to +5' elevation. o Additive 2: Work includes building the Rock Breakwater to +6' elevation. o Additive 3: Work includes building the Rock Breakwater to +7' elevation. Reef Breakwater: o Work includes minor earthwork as required to meet foundation elevations and construction of approximately 920 linear feet of Reef Breakwater. Marsh Fill: o Work includes excavating approximately 9,810 cubic yards of material from the nearby upland borrow areas and placement into the Marsh Fill template. Planting: o Work includes planting approximately 2.0 acres of low marsh species across the crest of the newly created Marsh Fill. Oyster Relocation: o Work includes relocating approximately 0.47 acres of live oysters within the Rock Breakwater footprint Project Location: The project site is located in Lavaca Bay, at East U.S. Highway 87 and South Commerce Street at Bayfront Peninsula Park, in Port Lavaca, Calhoun County, Texas. The anticipated substantial completion deadline for all Work is 230 days from Notice to Proceed. Owner anticipates the Project's total bid price will be approximately $9.0 million to $10.5 million dollars. All qualified Bidders will be considered without regard to race, color, religion, sex, age, national origin, protected veteran status, or disability. ** pre bid info : Bidders are expected to thoroughly inspect the site of work and to inform themselves regarding all local conditions using provided resources and abiding by all access restrictions at the site. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Conservation and Development

$7,752,327.00

Public - City

Site Work

33

21

33

9

Subscribe For Documents

131 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
80
Bidding Soon
881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2026

March 17, 2026

Project location map

Multiple Locations, Port Lavaca, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.