Published December 8, 2025 at 7:00 PM
Updated December 12, 2025
Site work and paving for a bridge / tunnel in Lansing, Kansas. Completed plans call for site work for a one-story above grade bridge / tunnel.
Proposals are requested for the construction of "City Project #2025-08, Robin Road Culvert Replacement". Sealed proposals must be submitted to the office of the City Clerk, Lansing City Hall, 800 First Terrace, Lansing, KS, 66043. The proposals will be publicly opened and read aloud. WORK UNIT DESCRIPTIONS AND GUIDANCE (SPECIAL PROVISIONS) MOBILIZATION - SP-1 A. The basis of payment for this item shall be lump sum B. Work performed by the contractor shall comply with Section 1600 of the Technical Specifications adopted by the City of Lansing C. This item shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site; for the establishment of all offices, buildings and other facilities necessary for work on the project, and for all other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. TRAFFIC CONTROL - SP-2 A. The basis of payment will be a lump sum for all necessary traffic control for the project. B. The Contractor shall furnish and erect all needed traffic control signs and shall furnish all needed flaggers. The cost of furnishing and erecting of all signs and furnishing flaggers shall be paid for under the Lump Sum bid for "Traffic Control". All signs, flaggers, and their respective locations and placement in relation to the work of this contract shall conform to the current edition of the C. Traffic control shall be installed in accordance with the Manual for Uniform Traffic Control Devices. ASPHALTIC AND CONCRETE PATCH SP-3 A. The basis for payment shall be a 2" Asphalt overlay (BM-2 or HMA) paid as a lump sum. B. All work performed by the contractor shall comply with Division 6000 of the Technical Specifications adopted by the City of Lansing and SD-60-1 (Modified to include 54" pipe) C. This work shall also include the backfilling and compaction of the bedding above the installed culvert to include but not limited to the the placement of flowable fill and Concrete Cap in (See SD60-1) Question Deadline 12/09/2025 Should a prospective bidder be in doubt as to the meaning of any provisions of the contract documents, he/she may submit to the Engineer a written request for the interpretation thereof 48 hours prior to the time established for the opening of bids. The person submitting the request will be responsible for its prompt delivery
Post-Bid
Bridges / Tunnels
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 12, 2026
Robin Rd, Lansing, KS
Related To This Project
Lansing, KS
Bid Date: Dec 31 2025
Lansing, KS
--
Lansing, KS
Bid Date: Sep 25 2025
Lansing, KS
Bid Date: Aug 20 2025
Lansing, KS
Bid Date: Aug 29 2025
Lansing, KS
Bid Date: Aug 06 2025
Lansing, KS
Bid Date: Jun 17 2025
Lansing, KS
Bid Date: Jun 12 2025
Lansing, KS
Bid Date: May 27 2025
Lansing, KS
Bid Date: May 21 2025
Lansing, KS
Bid Date: May 20 2025
Lansing, KS
Bid Date: May 15 2025
Lansing, KS
Bid Date: Apr 09 2025
Lansing, KS
Bid Date: Apr 22 2025
Lansing, KS
Bid Date: Apr 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.