Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Renovation of a mixed-use development in Perry Hall, Maryland. Completed plans call for the renovation of a educational facility.
MBE Participation (%) : 15.00 Question Deadline 12/05/2025 Online submission. No interpretation of the meaning of the plans, specifications, or other contract documents will be made to any bidder orally. To be given consideration, inquiries must be received at least seven (7) business days prior to the date fixed for the opening of bids The Contractor is required to complete all asbestos abatement described in the Asbestos Abatement Table and Asbestos Abatement Notes. The abatement scope of work listed in the Asbestos Abatement Table and Asbestos Abatement Notes is inclusive of all Base Bid and Add-Alternate work. The Bidder is responsible for determining the abatement scope of work associated with each phase of work: the Base Bid and each Add Alternate. The Bidder is advised that, within each room or area where work is accepted, the Award Bidder shall abate all exposed and accessible friable ACMs, and all ACMs made accessible during the course of renovations. Friable ACMs (including all pipe and pipe-fitting insulation, friable thermal system insulation, spray-on fireproofing, textured/acoustical plaster, ceiling/wall tiles, ACM debris, etc.) must be removed from all work areas. Replacement ceilings, walls, chase walls, cabinetry, finishings and materials shall not be put back covering these ACMs. The Contractor is not responsible for abating these ACMs where they remain concealed within building structural elements, and remain inaccessible during the entire period of renovation: unless abatement is necessary to complete the renovation or to create safe working conditions. The asbestos abatement scope of work includes ACMs or asbestoscontamination, which will be directly disturbed due to renovation activities, and which must be abated in order to create or maintain safe working conditions. The Contractor is responsible for all associated costs.
Award
Educational
$1,243,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
June 22, 2026
9021 Belair Rd, Perry Hall, MD
Related To This Project
Perry Hall, MD
Bid Date: Jan 06 2026
Perry Hall, MD
Bid Date: Mar 13 2025
Perry Hall, MD
Bid Date: May 07 2024
Perry Hall, MD
Bid Date: Jul 20 2023
Perry Hall, MD
Bid Date: Jan 19 2023
Rockville, MD
Bid Date: Dec 01 2025
Clinton, MD
Bid Date: Dec 08 2025
Jessup, MD
Bid Date: Dec 01 2025
Bel Air North, MD
Bid Date: Jan 14 2026
Baltimore, MD
Bid Date: Jan 22 2026
Saint Leonard, MD
Bid Date: Dec 08 2025
Saint Leonard, MD
Bid Date: Dec 19 2025
College Park, MD
Bid Date: Dec 08 2025
Annapolis, MD
Bid Date: Dec 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
