BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2026 at 7:00 PM

Updated January 12, 2026

Site work and paving for a mixed-use development in Landmark, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000308448 Question Acceptance Deadline 2025/12/10 12:00:00 PM CST Construction of granular base course including surface preparation and spot grade improvements on Provincial Road 227, from Provincial Trunk Highway 16 to Provincial Road 248, for a total construction distance of approximately 58.6km, in the Municipalities of Portage la Prairie and Woodlands. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages Subcompletion: Shall Be Defined as All Aggregate Production. Aggregate Production Must Be Completed by No Later Than May 31, 2026. Daily Liquidated Damages After This Specified Sub-completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. Completion: Shall Be Defined as All Work. Shall Be Completed by No Later Than October 15, 2026. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of One Hundred Thousand ($100,000.00) Dollars Will Be Charged to the Contractor for Unplanned Carryover if the Work is Not Completed by October 15, 2026. In Addition the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. The Assessment of the Lump Sum Liquidated Damages for the Completion of the Work Will Decrease in Direct Proportion to the Value of Work Completed Relative to the Actual Final Total Value of All the Work if the Work is Incomplete. The Work Shall Be Defined as All Work Not Including Contingency. The Maximum Liquidation Damage Charged at Any Given Time Shall Be Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date The Seasonal Shutdown Date for This Project is: October 15 of a Given Calendar Year, Which Does Not Apply to Aggregate Production. Official bid documents must be obtained from https://www.merx.com/mbgov/solicitations/open-bids/GRAVEL-ROAD-RESTORATION-PR-227-PTH-16-PR-248/0000308448 and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$6,777,550.00

Public - State/Provincial

Paving, Site Work

3

3

4

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
2
Bidding Soon
324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

January 12, 2026

Project location map

MB-311 & MB-206, Landmark, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.