BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruction of NW Orchard Street between NE Douglas Street and NW Olive Street, reconstruction of NW Olive Street from NW Chipman Road to end of road, storm sewer installation along NW Central Street and NW Forest Avenue, and construction of a stormwater detention basin at the south end of NW Olive Street. The reconstruction of NW Orchard Street and NW Olive Street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation. A. It is the intent of this coverage to accurately, clearly document and define pre-existing, postconstruction and/or construction conditions to minimize potential construction claims. B. Contractor shall provide to Owner one copy of a high quality color audio and video recording of the existing surface conditions within the project's zone of influence. The zone of influence shall be defined as an area within a temporary construction easement or public right-of-way, as indicated by the Drawings, or within 35 feet of the proposed Work. C. The following recording(s) shall be completed: 1. Prior to any construction activity. 2. Post-construction, immediately after project acceptance. D. The Owner reserves the right to reject and request another recording because of poor quality, unintelligible audio or uncontrolled pan or zoom. Under no circumstances shall construction begin until the Owner has received, reviewed and accepted the recording. E. A qualified, established recording company, knowledgeable in construction practices and experienced in recording of construction projects, shall perform the recording. If requested, the company shall provide examples of prior work and/or references. F. Contractor shall obtain permission from property owners prior to entering said property. G. Owner must be given adequate notice of the recording appointment so Owner has the opportunity to accompany the videographer. Question Deadline 12/17/2025 at 5:00 PM CT

Award

Roads / Highways

$5,430,314.00

Public - City

Paving, Site Work

236

42

11

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

February 20, 2026

Project location map

NW Orchard St, Lees Summit, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.