Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 10, 2025 at 7:00 PM
Updated December 11, 2025
Site work and paving for a road / highway in North Ridgeville, Ohio. Completed plans call for site work for a one-story above grade road / highway.
The work will consist of all labor and equipment required for the Taylor Parkway Rehabilitation Project and other necessary appurtenances in accordance with the specifications and contractual requirements on file in the Office of the City Engineer. Bidders must use the bid forms available from the Office of the Engineer or electronically upon request, with proof of payment for a non-refundable cost of fifty dollars. Each proposal must be accompanied by a bid guarantee which shall consist of an Ohio Statutory Bid Guaranty and Contract Bond in a penal amount equal to or greater than 100% of the bid price, as prescribed by ORC 153.57. Bonds must be issued by a surety company licensed in Ohio. Each bidder must submit evidence of their experience on projects of similar size and complexity, and proposals must include labels identifying the bid form and insurance bid bond information. Sealed bids must be clearly marked with the project name. All contractors and subcontractors are required, to the extent practicable, to use Ohio products, materials, services, and labor. Compliance with Ohio Equal Employment Opportunity requirements and prevailing wage rates as determined by the Department of Commerce is mandatory. All questions during bidding shall be emailed to bidinquiries@nridgeville.org. The email should have the project title in the subject line. Scope of work includes a complete resurfacing of Taylor Parkway. Work will include planing of the existing asphalt concrete surface followed by the application of a new intermediate course and surface course. Additional work will include catch basin adjustments and reconstructions; concrete blockouts; limited sidewalk replacement; and limited curb replacement to meet the City of North Ridgeville Standard Construction Drawings. Work may also include incidental grading and structure adjustments. The contractor is responsible for calling OUPS and requesting utility locates.
GC Bidding
Roads / Highways
$610,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2025
January 19, 2026
Taylor Pkwy, North Ridgeville, OH
Related To This Project
North Ridgeville, OH
Bid Date: Dec 08 2025
North Ridgeville, OH
Bid Date: Nov 03 2025
North Ridgeville, OH
--
North Ridgeville, OH
Bid Date: Sep 25 2025
North Ridgeville, OH
Bid Date: Aug 18 2025
North Ridgeville, OH
--
North Ridgeville, OH
--
North Ridgeville, OH
--
North Ridgeville, OH
Bid Date: Jul 08 2025
North Ridgeville, OH
Bid Date: Jul 14 2025
North Ridgeville, OH
--
North Ridgeville, OH
Bid Date: Jun 16 2025
North Ridgeville, OH
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
