BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2026 at 7:00 PM

Updated February 17, 2026

Site work and paving for a mixed-use development in W Yarmouth, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and playground / park / athletic field.

Chase Brook Park restoration and pedestrian bridge project includes: removal of brick walkway, trees vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic, tables, and interpretive signage, a three-year program for invasive species management. The work includes, without limiting the generality thereof, constructing a timber pedestrian bridge, riverbank stabilization, vegetative plantings, and stabilized stone dust (aggregate) walking paths with interpretive signage within Town property located at Chase Brook Park in West Yarmouth, MA. The contractor is responsible for providing all materials, labor, and equipment as specified to perform the work. Project Estimate: $1,580,000.00. The project's substantial completion date is December 31, 2026, which includes the first year of Invasive Species Management. Two additional years of Invasive Species Management are included in the project. Project construction must start no later than February 9, 2026, unless otherwise approved in writing by the Town. Time and Place For Pre-Bid Conference Not Applicable Not applicable Deadline for Written Questions December 12, 2025 By 12:00 p.m. Via email only to Laura Hayden: lhayden@yarmouth.ma.us. Performance Bond Not Applicable The Town of Yarmouth is requesting bids for the following: Chase Brook Park Restoration & Pedestrian Bridge. The work performed under this contract includes, but is not limited to: Removal of Brick Walkway, Trees, and Vegetation Installation of Timber Piles for Pedestrian Bridge Construction of Pedestrian Bridge Vegetative Plantings Coir Logs for Bank Stabilization Site Grading, Park Walkways Installation of Benches, Picnic Tables, and Interpretive Signage A 3-year Program of Invasive Species Management Other related items.

Award

Bridges / Tunnels

$1,341,580.00

Public - City

Paving, Site Work

20

14

2

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
514
Active Projects
289
Bidding Soon
2,556
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

February 9, 2026

Project location map

74 Town Brook Rd, W Yarmouth, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.