Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 4, 2025 at 7:00 PM
Updated December 5, 2025
Renovation of a fitness / recreation center in Winnipeg, Manitoba. Completed plans call for the renovation of a fitness / recreation center.
Reference Number 0000308893 Pricing Lump sum Replacement of Mechanical Rooftop Unit at Turtle Island Neighbourhood Centre 510 King Street The Work to be done under the Contract shall consist of Mechanical Rooftop Unit Upgrade with associated electrical and structural roof reinforcement as drawn and specified in issued for construction documents dated September 5, 2025. D2.2 The funds available for this contract are $400,000.00. 1 Refer to Division 01. 2 Prepare instructions and data using personnel experienced in maintenance and operation of described products. .3 Four (4) weeks prior to Substantial Performance of the Work, submit to the Consultant, one (1) draft copy of operating and maintenance manuals in Canadian English. 4 Copy will be returned with Consultant's comments. .5 Revise content of documents as required prior to final submittal. .6 Two (2) weeks prior to Substantial Performance of the Work, submit to the Consultant, three (3) final copies of operating and maintenance manuals in Canadian English. 7 Summary audit documents associated with requirements for LEED classification documentation. 8 Maintenance Data: 1 Provide operation and maintenance data for incorporation into Maintenance Manuals. 2 Include details of design elements, construction features, component function and maintenance requirements, to permit effective start-up, operation, maintenance, repair, modification, extension and expansion of any portion or feature of installation. 3 Include technical data, product data, supplemented by bulletins, component illustrations, exploded views, technical descriptions of items, and parts lists. Advertising or sales literature not acceptable. Include all warranty information. .5 Submit Maintenance Manuals to the Consultant for review. Manuals that are incomplete shall be returned to the Electrical Sub-Contractor for completion. Completed manuals shall be submitted, to the satisfaction of the Consultant, before final payment may be considered to be due. 6 Format 1 Refer also to Section 01 78 10 for formats for manuals. Where there is a discrepancy with this section, follow the requirements of 01 78 10. 2 Organize data in the form of an instructional manual. 3 Binders: vinyl, hard covered, 3 'D' ring, loose leaf 8.5 x 11 inch (219 x 279 mm) with spine and face pockets. 4When multiple binders are used, correlate data into related consistent groupings. Identify contents of each binder on spine. 5Cover: Identify each binder with type or printed title 'Project Record Documents'; list title of project and identify subject matter of contents. 6 Arrange content by systems under Section numbers and sequence of Table of Contents. 7Provide tabbed fly leaf for each separate product and system, with typed description of product and major component parts of equipment. B Text: Manufacturer's printed data, or typewritten data. 9 Drawings: provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages. 7 Contents 1 Refer also to Section 01 78 10 for formats for contents. Where there is a discrepancy with this section, follow the requirements of 01 78 10. 2Table of Contents: Provide: 1 Title of project. 2Date of submission. 3Names, addresses, and telephone numbers of Consultant and Contractor with name of responsible parties. 4 Schedule of products and systems, indexed to content of volume. .3For each product or system, list names, addresses and telephone numbers of subcontractors and suppliers, including local source of supplies and replacement parts. Product Data: Mark each sheet to clearly identify specific products and component parts, and data applicable to installation; delete inapplicable information. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions specified in Section 01 45 00. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Sub-Bidding
Fitness / Rec Centers
$30,000.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2025
January 19, 2026
510 King St, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jan 05 2026
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Dec 22 2025
Winnipeg, MB
Bid Date: Jan 15 2026
Winnipeg, MB
Bid Date: Dec 18 2025
Winnipeg, MB
Bid Date: Dec 03 2025
Winnipeg, MB
Bid Date: Dec 22 2025
Winnipeg, MB
Bid Date: Dec 15 2025
Winnipeg, MB
Bid Date: Dec 17 2025
Winnipeg, MB
Bid Date: Dec 22 2025
Winnipeg, MB
Bid Date: Dec 10 2025
Winnipeg, MB
Bid Date: Dec 01 2025
Winnipeg, MB
Bid Date: Dec 18 2025
Winnipeg, MB
Bid Date: Jan 14 2026
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
