BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Site work for an industrial development in Stanton, Kentucky. Completed plans call for site work for a one-story above grade industrial development.

The project involves the remediation of TENORM (Technologically Enhanced Naturally Occurring Radioactive Materials) media in three wooden above-ground storage tanks (ASTs), including the sludges and soils, as well as the removal of four ASTs associated with a former crude oil storage tank battery from historical oil recovery operations. The media has been contaminated due to the separation of crude oil and groundwater, which contained elevated levels of NORM that were enhanced during crude oil recovery processes. Previous investigations confirmed contamination with TENORM in both sludge within the wooden ASTs and soils in and around the tanks. RFB-118-26 FP Project requirements include solidifying sludge in three wooden ASTs with Portland cement, demolishing the wooden ASTs, and excavating and removing impacted soils for off-site disposal. Soil excavations are anticipated to reach approximately one foot in depth. Residual water and crude oil in the four steel ASTs must be removed and disposed of; the ASTs then cleaned, hauled from the site, and recycled. After excavation, the topsoil must be backfilled, the ground surface restored to its original grade, and the areas vegetated. Interested contractors are encouraged to attend a site visit. All procurement questions are to be directed to the buyer of record. Plans and specifications must be downloaded from the designated state plan room website, and only those who access documents through this source will be registered for addenda. There is no charge unless a hard copy is requested, in which case the contractor pays for the copy. Contractors must combine the entire official bid document and any required bid bond into one PDF attachment for submission. ALL PROCUREMENT QUESTIONS SHALL BE DIRECTED TO BUYER OF RECORD FOR THIS PROJECT. Question Deadline 01/09/2026 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered

Award

Industrial

$126,365.00

Public - State/Provincial

Site Work

5

16

8

7

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

March 1, 2026

Project location map

169 Maple St, Stanton, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.