BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

This is a service / maintenance or supply contract in Saratoga Springs, New York. Contact the soliciting agency for additional information.

The Capital Region Transportation Council (Transportation Council) is the designated Metropolitan Planning Organization (MPO) carrying out federal requirements for cooperative transportation planning and programming in Albany, Rensselaer, Saratoga, and Schenectady Counties (except for the Town of Moreau and the Village of South Glens Falls) in New York State. The Transportation Council is issuing a request for expressions of interest (REI) from qualified firms or individuals to undertake the West Avenue Complete Streets Study in Saratoga Springs. A continuation of the technical memo, Reconnecting the West Side, this project examines the long-term transportation impacts of projected growth within the City of Saratoga Springs' West Side and potential mitigation strategies. Complete streets design, improved access to public transit, and infrastructure cost sharing are possible solutions to consider to most effectively integrate these approaches within the specific context of the West Avenue corridor. This area continues to see increased development and redevelopment of residential, commercial, and mixed-use projects. The study is being funded by the Transportation Council and the City of Saratoga Springs through the Transportation Council's 2025-2026 Unified Planning Work Program as part of the Community and Transportation Linkage Planning Program. The study has a fixed budget of $77,000 for consultant services. The Transportation Council, on behalf of the City of Saratoga Springs, will administer the consultant contract and will jointly manage the study with the City. The Transportation Council and the City of Saratoga Springs would like to see this study completed within 12 calendar months from the date of contract execution. CR#: 2129314 Martin Hull will serve as the project manager and will be the primary contact for technical and administration questions. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
157
Bidding Soon
1,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

Project location map

Multiple Locations, Saratoga Springs, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.