BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and addition to an educational facility in Richmond Hill, Georgia. Completed plans call for the addition of a one-story above grade, eight-room educational facility.

The project involves adding a classroom wing to the existing McAllister Elementary School located in Richmond Hill, Georgia. The new classroom wing will consist of approximately 8-16 classrooms and restroom facilities. The construction must be carried out while school is in session and during the summer, with a potential start date in June 2026 and completion by June 2027. Question Deadline 12/18/2025 at 4:00 PM ET Questions relating to the project or RFP should be directed to the owner: Jeff Hodges Assistant Superintendent of Operations 912-851-4000 Email: jhodges@bryan.k12.ga.us The CP/GC will function as a Construction Manager-At-Risk (CM@R). During Pre Construction, the CM@R will be responsible for pricing and value engineering issues, along with issues of the facility's maintainability and constructability. When design documents for the project have been developed in sufficient detail (approximately 90% complete) the CM/GC will commit to a Guaranteed Maximum Price (GMP) for all construction and site development. The Owner reserves the right to request an alternative additive item for FF&E, which we may ask to be included in the GMP. (The Owner will accept or reject this item prior to finalizing the GMP.) Construction will commence with the release of distinct work packages while the total design documents are being finalized. The CM@R shall competitively select all construction subcontracts and other work appropriate for competitive selection using cost, other factors, and including owner input. The successful CM@R shall not be eligible to bid or enter into contract or subcontract for any of the construction or other services of any nature on the project without the specific approval of the Owner. In selecting a firm, the Owner will place emphasis on experience of the firm and assigned personnel in providing function on projects of similar magnitude and complexity as the proposed projects. Selection preference will be toward firms oriented to the construction field that have depths of knowledge and resources in principles of general contracting, scheduling, contract coordination and compliance, budget control, familiarity with State, County, and City laws, ordinances, and codes.

GC Bidding

Educational

$3,000,000.00

Public - County

Addition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
56
Bidding Soon
605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

June 1, 2026

Project location map

224 Veterans Memorial Pkwy, Richmond Hill, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.