Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Renovation of a civil project in Eau Claire, Wisconsin. Conceptual plans call for the renovation of a water / sewer project.
The headworks building (influent) requires major updates. This is the most critical part of the wastewater treatment process as it lifts all the water to the plant for treatment. It has been identified in the 2024 WWTP facilities plan. Bringing in innovative and new technology this project will increase efficiencies while addressing failing equipment. This project will be replacing screw pumps, motors, and gearboxes. Utilities will be replacing screening equipment, new compactors, and hydraulic concerns. While also giving The Plant more accurate influent flow measurement and sampling for increased accuracy of the whole treatment process. The effluent end of the WWTP requires updates. The current chlorination/dechlorination disinfection will be replaced with ultraviolet (UV) light disinfection. The existing chlorination/dechlorination system is aging and the concrete chlorine contact basins are rapidly deteriorating. The project will also include eliminating the flood pump setup which is used during times when the Chippewa River is at the flood stage. This setup was originally constructed in 1980 and has not been modified since. A concrete submersible pumping station with a dedicated power supply and controls will be installed. Finally, effluent laser meters will be installed to improve flow proportional processes (RAS pumping or chemical feed rates). Modifications will be made to the existing aeration grid. Rather than having a single aeration grid, it will be split into two separate grids. This will allow better control of the dissolved oxygen leading to improved treatment and energy efficiency. 404-006: Sewer - Headworks & Disinfection Rehabilitation 2026-2030 Capital Improvement Plan A sustainability-focused and renewable-energy improvement through the addition of a solar array will be installed and would supply additional renewable electricity to the WWTP. Each of the above projects have been identified in the 2024 WWTP Facilities Plan Amendment. These are large projects and rather than being in a constant state of "design and construction" over a number of years, they have been put together as a single project. As of December 5, 2025, this project is included in the City's 2026-2030 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. Funding is allotted for FY 2026 and 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$24,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
To Be Determined, Eau Claire, WI
Related To This Project
Eau Claire, WI
Bid Date: Dec 18 2025
Eau Claire, WI
Bid Date: Jan 14 2026
Eau Claire, WI
Bid Date: Jan 14 2026
Eau Claire, WI
Bid Date: Jan 14 2026
Eau Claire, WI
--
Eau Claire, WI
Bid Date: Jan 21 2026
Eau Claire, WI
Bid Date: Feb 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.