Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2026 at 7:00 PM
Updated January 24, 2026
Site work for a water / sewer project in Palmyra, Pennsylvania. Completed plans call for site work for a water / sewer project.
A certified check or bid bond for the amount of 10% of the total bid shall be required The successful Bidder shall be required to furnish performance and payment bonds in the amount of 100% of the Contract Price. The successful Bidder shall substantially complete the project within 365 calendar days of receipt of the Notice to Proceed. The Borough of Palmyra reserves the right to accept or reject any or all Bids. The Work under this Contract consists of furnishing all labor, materials, equipment, and services required to complete the electrical installation for the new Owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the Electrical Contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks. The Electrical Contractor shall coordinate with the pump station supplier regarding factory wiring and startup requirements, and shall furnish all raceways, conductors, terminations, and ancillary electrical work necessary to provide a complete and operable electrical system in accordance with the Drawings, Specifications, and applicable codes. Work will also include the concrete pad for the generator. a. Contract 2025-01 - General Construction for the installation of the prepurchased pump station, construction ofsanitary sewer line and demolition. b. Contract 2025-02-Electrical for the electrical connection to the pre-purchase pump station and furnish and install generator. Engineer opinion of probable construction cost for GC (2025-01) is $900,000 and for EC (2025-02) is $150,000. Question Deadline 01/16/2026 at 4:00 PM ET Online Portal. Bid Result - GENERAL CONSTRUCTION - PSI Pumping Solutions, Inc - $624,500.00 ELECTRICAL CONSTRUCTION -ElectraTech Services, LLC - $150,700.00
Bid Results
Water / Sewer
$775,200.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2026
March 23, 2026
Multiple Locations, Palmyra, PA
Related To This Project
Palmyra, PA
Bid Date: Mar 05 2026
Palmyra, PA
Bid Date: Mar 05 2026
Palmyra, PA
Bid Date: Mar 16 2026
Palmyra, PA
Bid Date: Dec 02 2025
Palmyra, PA
Bid Date: Dec 02 2025
Palmyra, PA
Bid Date: Oct 13 2025
Palmyra, PA
Bid Date: Jul 03 2025
Palmyra, PA
Bid Date: May 20 2025
Palmyra, PA
Bid Date: Apr 22 2025
Palmyra, PA
Bid Date: Jul 16 2020
Palmyra, PA
Bid Date: Mar 06 2025
Palmyra, PA
Bid Date: Mar 06 2025
Palmyra, PA
Bid Date: Jan 07 2025
Palmyra, PA
Bid Date: Dec 10 2024
Palmyra, PA
Bid Date: Nov 04 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
