BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2026 at 7:00 PM

Updated January 17, 2026

Site work for a mixed-use development in St George, Utah. Completed plans call for site work for a one-story above grade bridge / tunnel; and one-story above grade playground / park / athletic field.

There are four projects where it is proposed to install prefabricated pedestrian bridges.The first bridge is for the Fort Pearce Wash Trail. The second bridge is for the Middleton Wash Trail. The third bridge is for the Santa Clara River Trail. The fourth bridge is for the Lizard Wash Park. Below is information on each location, proposed pedestrian bridge information Questions Due Date: Dec 4th 2025, 2:00 PM MST The City of St. George requests bids for the purchase of 4 prefabricated pedestrian bridges for city trails and parks.

Award

Bridges / Tunnels

$199,740.00

Public - City

Site Work

11

7

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

February 9, 2026

Project location map

Multiple Locations, St George, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.