BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2025 at 7:00 PM

Updated January 16, 2026

Site work for a sidewalk / parking lot in Mount Pleasant, Iowa. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

The project involves the replacement of the upper parking lot at the Department of Public Safety Post 13. Design services are required for the complete demolition and removal of the existing upper parking lot and installation of new concrete paving, including construction drawings and specifications that define demolition limits, rough grading for the new aggregate base, pavement striping, accessible parking layouts, and associated handicap signage. The project also includes the replacement of the sidewalk and front stoop areas with consideration for current ADA compliance requirements and solutions to prevent water infiltration into the vestibule. Coordination with geotechnical investigations, support for integration of recommendations from the geotechnical report, and all necessary survey work are part of the scope. The selected designer must also participate in multiple scheduled reviews, provide material recommendations, comply with all relevant federal and state codes, and assist in bidding and construction administration, including submittals, RFIs, periodic site visits, and preparation of closeout documentation. All documents prepared are to be provided in their native computer format and PDF, and all costs for the use of State-required management software are covered by the owner. Pricing submitted must be a lump sum inclusive of reimbursables, with a unit price for additional site visits. Eight site visits at key project milestones are required at a minimum, with more as deemed necessary by the proposer. Questions, requests for clarification, and suggested changes from Respondents due to Construction Procurement 12/22/25 @ 3:00 PM Construction Manager (McGough Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of the replacement to the upper parking lot at the Department of Public Safety Post 13. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner's maintenance staff. 1.3.4 Use of the State of Iowa's construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 The following design services will be needed: 1.3.5.1 Provide complete construction drawings and specifications for the demolition and removal of the existing upper parking lot, as well as the installation of new concrete paving. The documents shall clearly define limits of demolition, required rough grading for the new aggregate base, and the design intent for pavement striping, accessible parking layouts, and associated handicap signage. 1.3.5.2 Develop detailed construction drawings and specifications for the replacement of the sidewalk and front stoop areas. The design shall address current ADA compliance requirements, as the existing sidewalk and ramp do not appear to meet accessibility standards. Additionally, the design must incorporate solutions to prevent water infiltration into the vestibule originating from the front stoop. 1.3.5.3 Collaborate with and provide support for the geotechnical investigation, including coordination with the geotechnical consultant and integration of recommendations from the geotechnical report into the project design and constructiondocuments. 1.3.6 Field examination of the existing buildings. 1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include nonproprietary equipment and systems. 1.3.8 Designer shall include any and all survey work required for completion of project. 1.3.9 Coordinate with State agenciesto confirm utilitiesthat may be abandoned as well asshut down requirements where required. 1.3.10 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.11 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.12 Quality control during Design, Preconstruction and Construction. 1.3.13 Compliance with all Federal, State, and applicable AHJ codes. 1.3.14 Completion of State building and energy code documents, asrequired. 1.3.15 Design review will be conducted at 100% design development documents, 50% construction documents, and 95% construction documents. Dates for design review meetings to be coordinated with the design and project team and set no later than the design kickoff meeting. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions. 1.3.16 Review with the Department of Inspections, Appeals, and Licensing's Building Code Bureau for approval of plans or exemption from review. All fees associated with the Bureau are the responsibility of the designer. 1.3.17 Develop and distribute agendas and meeting minutes for all meetings during the design phase. 1.3.18 Construction cost opinions provided by the Design Professional team during Design (100% design development documents, 50% construction documents, and 95% construction documents) with a Final Estimate for construction included with bid documents, per Iowa Code. 1.3.19 Construction drawings, specifications (the Construction Manager will produce Divisions 00 and 01), and addenda. 1.3.20 Provide bid alternates as determined during the course of design and bid package development. 1.3.21 Assist Owner and Construction Manager in obtaining bids from qualified contractors. 1.3.22 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental Instructions for design revisions, and punch lists within the construction management software program. 1.3.23 Participation with project team during construction progress meetings as required. Designer shall participate in bi-weekly conference calls during the constructionperiod. 1.3.24 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit. 1.3.25 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project. 1.3.26 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing,mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes. 1.3.26.1 Design Development Documents 1.3.26.2 Construction Documents 1.3.26.3 Bidding or Negotiation Assistance 1.3.26.4 Construction Phase Include at a minimum, eight (8) site visits. Design kick off/Building evaluation, 100% design development document review meeting, Pre-bid meeting, Pre-construction kickoff, Construction Field Observation (2), Substantial completion/punch list development, Punch list/Final Completion approval, and one year warranty correction period visit. Design Review at 50% construction document and 95% construction document development will be conducted via conference call. Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
94
Bidding Soon
855
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 1, 2026

Project location map

1300 S Grand Ave Suite 201, Mount Pleasant, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.