Site work and new construction of a mixed-use development in Springer, New Mexico. Completed plans call for the construction of a one-story above grade educational facility; one-story above grade educational facility; and for site work for a educational facility.

A. Interior and exterior coatings, and insulation, of steel water reservoirs. B. Coating of exposed piping. C. All coating testing. A. Pipes, materials, and appurtenances for potable water systems. B. Installation. A. All sanitary sewer work and materials in this Section shall be performed in accordance with the Contract Drawings and the New Mexico Standard Specifications for Public Works Construction, Latest Edition, including all updates, and all applicable laws, codes, and regulations. B. Generally includes but not be limited to furnishing all necessary material, labor, and equipment to construct the following: 1. Installation of sanitary sewer collection lines 2. Installation of building sanitary sewer service laterals 3. Installation of precast concrete manholes C. Trench excavation, backfill, and compaction shall be performed in accordance with Section 31 00 00 of these specifications. D. All pipes shall be installed in an uphill direction where possible beginning at the lowest elevation. In the event that the Contractor wishes to deviate from this, sufficient elevation checks shall be made of the eventual downstream terminus points and approval shall be obtained from the Engineer prior to beginning work. A. Contractor shall furnish all labor, materials, equipment, and incidentals required to provide and install a diesel fire pump system with fire protection water capability. The skid mounted equipment will be pre-wired, pre-plumed and as a package system with full controls as specified herein. A. See General Conditions and Supplemental General Conditions. B. The requirements listed under General Conditions and Supplemental General Conditions and the General Requirements are applicable to this section and all subsequent sections of Division 21 and form a part of the contract. C. Division 22 for Plumbing Systems. D. Division 23 for Heating, Ventilating and Air Conditioning (HVAC) Systems. E. Division 26 for Electrical Systems. F. Division 28 for Fire Alarm Systems. G. Division 33 for requirements of site utility systems, including fire main water distribution system. H. All electrical work, regardless of voltage which is provided under Division 21 shall comply with the requirements of the National Electric Code (NEC) and Division 26. A. The work in this section includes the furnishing of all labor, materials, equipment, transportation, hauling and services required in connection with the excavation, backfilling, compaction, grading and removal of earth from the site required for the installation of the mechanical work specified herein under Division 21. B. The Contractor shall provide the services of a qualified underground locator to field locate and mark all existing buried utility lines, public and private, piping, conduits, etc., within the required construction area prior to the start of any trenching or excavation work. A. See General Conditions and Supplemental General Conditions. B. The requirements listed under General Conditions and Supplemental General Conditions and the General Requirements are applicable to this Section and all subsequent sections of this Division and form a part of the contract. A. The work in this section includes the furnishing of all labor, materials, equipment, transportation, hauling and services required in connection with the excavation, backfilling, compaction, grading and removal of earth from the site required for the installation of the HVAC work specified herein under Division 23. B. [Provide the services of a qualified underground locator to field locate and mark all existing buried utility lines, public and private, piping, conduits, etc., within the required construction area prior to the start of any trenching or excavation work.] This section includes Owner's separate Performance Assurance Contractor (PAC) process requirements related to HVAC systems, assemblies, and equipment. The Contractor shall provide the necessary labor, instrumentation, tools and equipment for this portion of the Work. A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing the following operations recognized as necessary for the labeling of the telecommunications infrastructure as described on the Drawings and/or required by these specifications. B. It is the intent to create a Class 3 system of administration as per ANSI/TIA/EIA 606-A Standards. As such, all elements must be labeled with unique identifiers as described in the following sections. C. This section includes minimum requirements for the following: 1. Labeling Communications Cabling 2. Labeling Closet Hardware 3. Labeling Work Stations A. All Audio-Visual systems will be part of Bid Lot#. Rough-ins for the systems are to be provided as part of the Base Bid. 1. BID LOT 3: Provide and install the complete audio-visual system in Multipurpose Room 118 as indicated. 2. BID LOT 4: Provide and install the complete audio-visual system in Technology Classroom 124 as indicated. 3. BID LOT 5: Provide and install the complete audio-visual system in Parent Workroom 101B as indicated. 4. BID LOT 6: Provide and install the complete digital signage system in Reception 101 as indicated. B. Provide a bid to the project with the Bid Lots listed above broken out into each bid lot. C. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing the following operations recognized as necessary for the installation, termination, testing, and labeling of all telecommunications infrastructure as described on the Drawings and/or required by these specifications. 1. Furnishing equipment, cabling, supplies, and materials 2. Furnishing labor for installation, testing, software programming, and user training. 3. Third-party testing and commissioning 4. Service and maintenance contract 5. All other operations that are not explicitly described herein but are necessary for a complete functioning system shall adhere to the performance parameters as described on the drawings and/or required by these specifications. D. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 26, Section 26 0500, "Common Work Results for Electrical": Power supply, conduit and wiring. 2. Division 27, Section 27 0500, Common Work Results for Communications. 3. Division 27, Section 27 4181, Audio-Visual Control Systems. A. Providing Control System design submittals and two Control System design revisions as outlined in 'Submittals - Software". B. Providing control system programming as specified. C. Developing Control System help-desk and system administrator functionality. D. Securing, from the Owner, private IP addresses for use by Ethernet equipped control system processor. Let the controller assign a DHCP address to the devices on the control sub-net. E. Providing control system interfaces to Owner-furnished, Contractor-installed (OFCI) AV equipment. RS 232, RS 485, IP or Relay contact F. Providing control system interfaces to multimedia mechanical systems including motorized projection screens, lifts where specified. G. Providing low voltage control system interfaces to facility lighting and mechanical systems where specified. Question Deadline: 01/06/2026 Questions must be submitted to Juan Dorado, AIA - Dekker, e-mail: juand@dekkerdesign.org

Post-Bid

Educational

$47,205,406.00

Public - City

New Construction, Site Work

278

41

125

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
49
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 16, 2026

Project location map

To be determined, Springer, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.