BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2026 at 7:00 PM

Updated January 29, 2026

Renovation of a service station / car wash facility in Redondo Beach, California. Completed plans call for the renovation of a service station / car wash facility.

Design, Build, Rehabilitation, and Maintenance Services for Removal and Replacement of Existing Unleaded Gas and Diesel System Fueling Facility Infrastructure. The City of Redondo Beach is looking for qualified entities to perform services as described for the specified project. Question Deadline 01/06/2026 at 5:00 PM PT All questions regarding the meaning or intent of the information provided in this RFP, including procedure, specifications, and Contract provisions, shall be submitted to the City's online procurement portal The objective of this project is to design, build, and maintain a complete, turnkey municipal fueling system that provides reliable, safe, and efficient delivery of unleaded gasoline and diesel fuel for the City's fleet operations. The upgraded facility shall meet or exceed existing fueling capacity, comply with all applicable federal, state, and local environmental and safety regulations, and be designed for long-term durability and uninterrupted operation. As part of the project, the Contractor shall perform a comprehensive condition assessment of the existing fueling infrastructure-including tanks, piping, pumps, and dispensers to determine reuse feasibility and to guide the construction sequence. To maintain continuous fueling for City operations, the Contractor shall implement a phased construction plan supported by immediate temporary repairs or temporary fueling solutions whenever existing components fail or must be taken offline for assessment, permitting, or construction. These temporary measures shall ensure that all fueling services remains available throughout the duration of the project. The Contractor shall provide full design-build services, including replacement of unleaded dispensers, turbines, pumps, piping, monitoring systems, and the diesel dispenser, along with installation of all required safety, control, and compliance features. If necessary, the Contractor shall furnish temporary fueling provisions to ensure uninterrupted City fleet operations during construction. The City also seeks an extended maintenance and testing program to sustain long-term performance, maintain regulatory compliance (e.g., SCAQMD), and ensure rapid response to any operational issues throughout the system's service life.

Post-Bid

Service Station / Car Wash

$2,450,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
0
Bidding Soon
1,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2026

May 26, 2026

Project location map

To be determined, Redondo Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.