Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 5, 2026 at 8:00 PM
Updated June 10, 2026
Demolition, site work and new construction of a water / sewer project in Rosebud, South Dakota. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
Pre-Solicitation Notice: Rosebud Lift Station Construction I will post the actual solicitation soon. Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd POP: 240 calendar days Construction Magnitude: Between $500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See Section H.50. Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system. Contact Information: Primary Point of Contact: Daniel Cotto Email: daniel.cotto@ihs.gov Phone Number: 2404617841 Alternative Point of Contact: (contact only if Daniel Cotto is not available) Andrew E. Hart Email: andrew.hart@ihs.gov Phone Number: 206-375-4443 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Water / Sewer
$1,000,000.00
Public - Federal
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2026
August 5, 2026
1319 Soldier Creek Dr, Rosebud, SD
Related To This Project
Rosebud, SD
Bid Date: Mar 04 2026
Rosebud, SD
Bid Date: Apr 09 2026
Rosebud, SD
Bid Date: Mar 18 2026
Rosebud, SD
Bid Date: Apr 17 2026
Rosebud, SD
Bid Date: Oct 15 2025
Rosebud, SD
Bid Date: Aug 06 2025
Rosebud, SD
Bid Date: Nov 28 2025
Rosebud, SD
Bid Date: Jun 27 2025
Rosebud, SD
Bid Date: Jun 11 2025
Rosebud, SD
Bid Date: Apr 22 2025
Rosebud, SD
Bid Date: Apr 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
