BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Renovation of a communication facility in Farmington, Minnesota. Completed plans call for the renovation of a one-story above grade communication facility.

The Federal Aviation Administration, Enroute Construction Branch, seeks to replace multiple power panels at the Minneapolis Air Route Traffic Control Center in Farmington, Minnesota. This project is set aside for small businesses under NAICS code 238210 with a size standard of $19.0 million. The price range for this requirement is below $100,000. Contractors must be registered in the System for Award Management (SAM) website to be eligible for award of a contract. Offerors are cautioned to read the Request for Offer carefully and ensure all proposals conform to the requirements of Section L and M. Faxed offers and amendments will not be accepted. Amendments to the solicitation will be posted on the website and not sent in paper copy. Contractors should periodically check the website for updates. This is a negotiated procurement that will result in a firm fixed price, one job lump sum contract, which will be awarded to a single contractor. The Contractor is to provide labor, materials, and supervision to complete work at the Minneapolis (ZMP) ARTCC in Farmington, Minnesota. All work shall be in accordance with FAA Specification, Drawings, and Wage Determinations. The Prime Contractor is responsible for all items of work identified in the attached FAA Specification provisions of the Contract as described in Section J. Comments, suggestions, or questions on this document should be addressed to: Federal Aviation Administration Power Services Group, Systems Engineering Team, AJW-222 800 Independence Avenue, SW Washington, DC 20591 Question Deadline 01/09/2026 Any offeror desiring an explanation or interpretation of this solicitation, specifications, etc., must request it in writing at least five (5) days prior to the date specified for receipt of proposals. Oral explanations or instructions are not authorized and shall not be binding. The Contracting Officer is the only person authorized to issue clarifications, interpretations, or changes to the specifications.

Post-Bid

Communication

$100,000.00

Public - Federal

Renovation

13

15

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
158
Bidding Soon
1,616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 2, 2026

Project location map

To Be Determined, Farmington, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.