BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a playground / park / athletic field in Harbor Beach, Michigan. Completed plans call for site work for a playground / park / athletic field.

As of February 3, 2026 this project has not yet been awarded. A timeline for the award has not yet been established. The Project includes electrical utility work related to adding 24 campsites to North Park around 2 softball fields that are being renovated as part of a separate contract. The electrical work includes but is not limited to RV power pedestals, CT cabinet metering assembly and distribution power panels, conduit, wiring, grounding system, and hand holes. Question Deadline 12/23/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Townley Engineering: Aaron Townley or Chris Townley at: aaron@townleyengineering.com or chris@townleyengineering.com, with HARBOR BEACH - BRUCE JOHNSON SPORTS COMPLEX - ELECTRICAL Bid Document Questions. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Owner reserves the right to accept or reject any bid which is considered in the best interest of the Owner.

Bid Results

Playgrounds / Parks / Athletic Fields

$237,775.00

Public - City

Site Work

14

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
96
Bidding Soon
707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2025

January 29, 2026

Project location map

310 S Huron Ave, Harbor Beach, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.